Developers: | Rillsoft |
Technology: | Project management systems |
Feature of Enterprise is the possibility of calculation of balance of resources as machines and personnel. At the same time the need for quantity of resources not just is calculated, but their professional skills, belonging to a command, existence of non-working days and employment in other projects are considered. Besides resource planning taking into account structure of the enterprise or a binding to location of objects is possible.
Project planning
- Scheduling, Gantt's Diagram, Network diagram
- Automatic calculation of completion dates
- Use of templates of projects
- Chart of cost
Control of execution of projects
- Baseline plans, status of execution of the project
- Plan-Fakt-Sravneniye
- Control of accomplishment of terms and project cost
- Financing control
Resource planning
- Belonging to a command
- Workforce planning on the basis of specialties
- Materials requirement, equipment
- Analysis of use of resources
Balance of resources
- Comparison of resource requirement with existence
- Graphic display of balance of resources
- Balance of personnel, equipment
- Workforce planning for certain working objects
Multiproject management
- Scheduling for all projects
- Balance of resources in the multiproject
- Optimal loading of resources in the multiproject
Representation and reports
- Representation formatting
- The set reports
- The generator for creation of own reports
Ability to integrate
- Import from MS Project through XML-Format
- Import of design data from the text file in the CSV format
- Export to MS-Project through XML-Format
- Export to the MS Excel