ASK Labs started installation commissioning the furnace ladle on Seversky Pipe Plant
23.11.10, 11:54, Msk
Specialists of ASK Labs completed repairs and service of the Pech-Kovsh installation on JSC Seversky Pipe Plant, Pipe Metallurgic Company, entering into Pipe Metallurgical Co. Within these works specialists of ASK Labs carried out upgrade of SCADA, and also connected and debugged a new tribe device. Now started the last stage of implementation of this project: to commissioning of the object in commercial operation.
Installation to bake a ladle is a link in the uniform technology scheme of receiving metal. After smelting in the melting unit the semi-product arrives in Pech-Kovsh where metal is brought to the set chemical composition and temperature, including, with narrow limits of maintenance of elements.
On it cooperation of ASK Labs and Seversky Pipe Plant does not come to an end. Works on Pech-Kovsh installation upgrade will be continued, negotiations on other directions of cooperation are conducted. The CEO of ASK Labs company Golovin Alexander so commented on completion of works on Pech-Kovsh installation repair: "The basic APCS is base for the successful implementation of the most advanced technologies of stabilization and optimization of technology process created within the concept of Automation 2.0. That is why in our company a lot of attention is given to creation of the base for Automation 2.0. And the appreciation of our works at Sevresky Pipe plant is extremely important for us".