RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

GK 1520 equipped with Russian digital automation a section of the Ulan-Bator railway on the border of Mongolia and China

Customers: Ulan-Bator Railway (UBZD)

Transport

Product: IT outsourcing projects

Project date: 2023/07  - 2024/01

2024: Introduction of digital control of train traffic on the Zamyn-Uud-2 and Shargyn ovoo sections

The ZHAT GK 1520 division (part of National Projectstroy) introduced digital control of train traffic on a new section of the track between the Zamyn-Uud-2 and Shargyn ovoo stations. This will increase the throughput of the Zamyn-Uud-Erlian border crossing between Mongolia and China. About this GC 1520 reported on February 29, 2024.

Specialists of the Division equipped the Russian automation of their own design and production with a path with a length of 14.2 km, as well as the trips Shargyn-Ovoo and Zamyn-Uud-2. On the stretch, a system of interval control of movement on the radio channel was introduced.

Management and control of the site will be carried out from the transportation management center in Ulan Bator.

In addition to increasing train exchange, digitalization will improve the safety and reliability of transportation. The work is part of the Russia-Mongolia-China economic corridor development project.