RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Ekaterinburg Module (BFG iMRP)

Customers: Module Yekaterinburg

Yekaterinburg; Power

Contractors: BFG Group
Product: BFG iMRP
Third product: Consulting projects

Project date: 2017/01  - 2018/01

2018: Analysis of the capabilities and limitations of production business processes

In 2017, the demand for the products of Module LLC exceeded the capabilities of the enterprise. Long production times and a lack of understanding of when the order will be ready led to a delay in the deadlines. BFG Group carried out a project to analyze the capabilities and limitations of production business processes of Module LLC based on the use of its own software.

Within the framework of the project, the following works were carried out:

  • Stage of data collection, verification and validation;
  • A simulation production model has been created;
  • Analysis of opportunities and limitations was carried out;
  • Alternative "how can it be" models built;
  • Implementation of the selected reengineering plan "as it can be."

As a result of the implementation of the reengineering plan prepared by BFG Group, the results were achieved:

  • Increased output by 2.5 times;
  • Increased profit 7 times;
  • Reduced order execution time by 1.4 times;
  • Reduced inventory value by 3 times.