RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2

Sitronics Electro: eStation Super Fast Charging Stations for Electric Vehicles

Product
Developers: Sitronics Electro
Date of the premiere of the system: 2024/05/28
Last Release Date: 2024/06/24
Branches: Transport

Content

Main article: Electric filling stations (electric charging stations, ESS)

2024

Introduction of the eStation Super, eStation Mini and eStation Mini Duo line

Sitronics Electro first presented its own line of fast and slow charging stations: eStation Super, eStation Mini and eStation Mini Duo. For production, Russian components are used, including controllers of their own design. The company announced this on June 24, 2024.

The stations have high reliability, security and intelligent control systems, including power balancing and support for the modern "plug & charge" identification mode.

eStation Super - a DC station with a capacity of up to 262 kW has already been put into mass production. When developing Sitronics, Electro paid special attention to the return on ESS for the owner. It comes with a high percentage of successful sessions, a simultaneous charge of up to four electric vehicles and a feed of up to 400 A and 1,000 V per electric vehicle fast charging cable. The station has a clear and transparent fault diagnosis: operators and owners of ESS receive online information about the performance of their components. Most errors can be corrected without leaving the site of technical personnel.

The line also includes AC stations: eStation Mini - a station with one 22 kW connector, eStation Mini Duo - with two 44 kW connectors. Two mounting options are available for these slow charging ESCs - floor or wall. The range with an anti-vandal body protects against damage and increases the durability of the ESV. All stations are designed by Artemy Lebedev's studio.

Creating the first sample eStation Super

Operator Sitronics Electro has created the first example of a fast charging station for electric vehicles. The company announced this on May 28, 2024.

The company's customers will receive the first eStation Super stations in early 2025. Serial production is launched in May 2024, certification for compliance with the 719 Decree of the Government of the Russian Federation "On Confirmation of Industrial Production in the Russian Federation" will take up to six months.

eStation Super is a DC electric charging station with a capacity of up to 262 kW. The ESV allows you to simultaneously charge up to four electric vehicles and flexibly balance power between power connectors. Particular attention during the development is paid to ease of operation and reducing downtime: automatic online diagnostics are configured at the station, which will correct most errors without visiting the site of technical personnel.

File:Aquote1.png
Sitronics Electro has more than 300 charging stations from Russian and foreign manufacturers, which charge thousands of users every month. We laid the foundation for the production of our own stations and controllers for them. We expect that the indicator of successful sessions on the first attempt - a key quality parameter - at our station will be 20% higher than the market, - said Andrey Gurlenov, executive director of Sitronics Electro.
File:Aquote2.png

The presented Sitronics Electro eStation Super supports a modern "plug & charge" identification mode, which provides an easy and safe way to charge electric vehicles without entering a mobile application. The station has a stylish design, which was developed by Artemy Lebedev's studio, and can be personalized for customers.