Customers: Kuban Credit Krasnodar; Financial services, investments and audit Contractors: Sitronics Product: Sitronics: Modular Data CentersSecond product: MasterSCADA Project date: 2024/07 - 2025/01
|
2025: Creation of a turnkey data center
Sitronics Group implemented a project to create a turnkey data center for Kuban Credit Bank. Sitronics announced this on February 4, 2025. The customer chose the format of a modular data center consisting of specially connected containers - this design allows, if necessary, to move the object to another flat area where there is power supply and a point of water supply and discharge. The total design electric power of the data center is 330kW. The machine room houses 26 telecom cabinets with a height of 45U to accommodate active IT equipment. Cooling is organized according to the principle of "hot corridor" with the supply of cold air from under the false floor space, freon precision air conditioners with steam humidifiers are used.
The internal space is organized in such a way that, in addition to the machine room, a hall for two operators, an electrical room, an air conditioner, a warehouse, and a separate room are allocated. provider Monitoring and remote control of network and engineering equipment is carried out using a complex of systems, including the developed Sitronics Group solution based on. MasterSCADA The data center is powered from three power supply sources and uses modular systems UPS with the reservation 2N scheme, a cooling system according to the N + 1 scheme using domestic air conditioners, an automatic fire extinguishing system based on halon-125ХП.
This data center was built under the design control of our separate division in Krasnodar using modern technical solutions. In this project, we used a bus duct with special power take-off boxes with real-time control of all basic parameters. If we talk in general, then we have already managed to replace about 70% of the components in the created modular data centers with domestic ones, which solves the problem of independence from foreign vendors, said Aleksei Morozov, vice president of technology at Sitronics Group. |
Our partners from Sitronics Group implemented the project using domestic technologies, efficiently and promptly, - said Maxim Grechikho, head of the information technology department of Kuban Credit Bank. - Thanks to World Data Centre "Kuban Credit" will be able to quickly and safely increase the volume of customer operations. |
Alexander Tulenkov, Head of the Technical Means and Communications Department of Kuban Credit Bank, adds that all the solutions used in the project guarantee a high level of reliability, which means uninterrupted operation of the World Data Centre even in conditions of critical loads on the Krasnodar power system in the summer heat.