RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

At the airport of Gelendzhik IT infrastructure is constructed

Customers: Gelendzhik airport

Contractors: Asteros
Product: Projects of creation of complex IT infrastructure

Project date: 2009/11

At the new airport of Gelendzhik the project on creation of IT infrastructure is complete. The project is executed by Bee-Ey-Si company (enters into the Asteros group). All systems are started in work in record time and in severe conditions of the continuing construction. During the project design of all complex of the systems of the airport, namely engineering and telecommunication systems, security systems, basic IT services (only 27 systems) is executed. The problem of creation of IT infrastructure is solved: structured cabling systems (SCS), local computer network, system of connection to global networks (Internet) and systems of telephone communication.

Installation of SCS was complete in three weeks, and other communications (network, the Internet and the IP telephony) were completely organized in a week. The project is executed in the terms stipulated by the agreement and within the budget.

For acceleration of terms of project implementation preliminary works on creation and setup of a local network, connection to the Internet and a telephone network were executed before external communication channels were brought to objects of the airport. As soon as providers provided receipt of signals, connection of local networks to external sources was executed far off in one day. 100 jobs are put into operation.