| Customers: Krasnogorsk Zverev Plant (KMZ) Krasnogorsk; Mechanical and Instrument Engineering Contractors: BFG Group Product: BFG Simulation (formerly BFG CMT)Project date: 2023/09 - 2023/12
|
2023: Building a digital prototype of manufacturing sites
Building a digital prototype of specific production sites to optimize them with BFG Simulation allowed a deep risk analysis in predicting production times and expanding bottlenecks.
