Project

Sdac and Asiastar brands complete modernization of the central warehouse in Smolensk

Customers: Veychai-Rus Tradeinvest, VRTI (Weichai)

Product: Intekey WMS

Project date: 2024/11  - 2025/05

2025

Modernization of the central warehouse in Smolensk

SDAC and ASIASTAR brands completed the modernization of the central warehouse in Smolensk. In June 2025, state-of-the-art warehouse logistics and automated metering systems were certified. Veychai-Rus Tradeinvest announced this on June 23, 2025.

  • The total warehouse area after modernization increased from 3500 sq.m. to 5000 sq.m.
  • The warehouse is equipped with an innovative WMS management system, which eliminates the possibility of error when sending an order to a dealer
  • Upgraded Warehouse Closes 100% Spare Parts Requirement
  • The company has increased its staff by 5 times

After modernization, the total area of ​ ​ the warehouse increased from 3500 square meters. m to 5000 square meters. m. On the territory there are multi-tier and mezzanine racks, narrow-passage stackers and other equipment. The warehouse is equipped with the latest safety requirements, the warehouse metal racks easily change configuration and are reliable, thanks to the rigid design and fixation to the floor. During the design, engineers laid down an increased margin of safety and stability. Braces strengthen the rigidity of the structure, and special retainers protect the beams from being knocked out by forks of the loader.

Management technologies have been integrated into the warehouse, including the WMS (Warehouse Management System), which allows you to automate all operations in the warehouse, from putaway to shipment of spare parts to dealers. Thanks to the WMS system, the probability of an error when sending an order to a dealer center is practically eliminated by automatically checking the completeness of the cargo.

As of June 2025, the warehouse 100% closes the need for spare parts for the provision of regular maintenance of cars both officially sold in the Russian Federation and imported in parallel imports. Moreover, now more than 90% of warranty repairs are also provided with spare parts from the availability of a warehouse.

An expansion of the warehouse and logistics departments by 5 times ensures uninterrupted deliveries even at peak loads.

File:Aquote1.png
We are responsible for the implementation of the strategy to expand our presence in Russia. The modernization of the warehouse in Smolensk is just the first of many steps in achieving this goal. Dealers throughout the country, from Murmansk to Sakhalin, are now provided with timely deliveries and the availability of any components for our transport, - said Evgenia Alexandrova, Director of the Transport Department of the SDAC and ASIASTAR brands.
File:Aquote2.png

Implementation of Intekey WMS LITE in a short time. Record efficiency in 2.5 months

Call

A new warehouse in Smolensk (5000 m ²) had to be launched in 3 months. The goals are not just to start working in the system, but to immediately reach ideal indicators:

  • Exclude errors (previously there were ~ 8%);
  • Double the storage density with narrow-pass equipment;
  • Translate the team to "digit" so as not to lose a minute (ruble).

Solution: WMS without bureaucracy

Instead of long approvals - audit and focus on the main thing:

  • The basic version of Intekey WMS LITE - introduced the system kernel under the hard deadline;
  • Point integration - connected WMS with 1C through a ready-made INconnect module: data is synchronized in seconds;
  • Complete departure from paper - employees work with shipping documentation, and labels are printed automatically;
  • Dynamic storage - the system itself selects the optimal places for cargo.

What has changed

2.5 months instead of 3 - and the warehouse works as a clock:

  • Accuracy above 99% (errors dropped from 8% to <1%);
  • 90% of processes without paper - checks, certificates, invoices in the system;
  • 20-30% faster - acceptance, shipment, inventory;
  • Employees spend time on tasks, not looking for an item.

Complex equipment

We delivered server equipment, Point Mobile PM351 shipping documentation printer , TSC thermal transfer labels, and. industrial Wi-Fi

The main thing is simplicity

We did not load the project with unnecessary functions. They took a proven and stable version of INTEKEY WMS LITE, which solved key pains - and the result came immediately after launch.

Project Implementation Date: December 2024 - January 2025