Novosibirskenergo of PRP
Company
Power
Since 1911
Russia
Siberian Federal District of the Russian Federation
Novosibirsk
Chaplygin St., 57.
Since 1911
Russia
Siberian Federal District of the Russian Federation
Novosibirsk
Chaplygin St., 57.
Revenue millions
Assets
+ Novosibirskenergo of PRP
The set electric power of JSC Novosibirskenergo is 2,522 MW, thermal - 6,782 Gcal/hour. The company provides power supply of the Novosibirsk region and the centralized heat supply of Novosibirsk and Kuibyshev, is a noticeable player of wholesale market of the electric power.
Core activities
- Production of electrical and thermal energy
Main types of products
- The electric power — 64.7%
- Heat power — 32.7%.
Electric power of JSC SIBECO is 3089 MW, thermal - 7,897 Gcal/hour.
History of the company
The Novosibirsk power engineering specialists have rich history. Here some dates and digits:
- 1911 - the New Nikolaev urban power plant began to work: in a year 295 thousand kWh of energy were developed. In total 549 subscribers were serviced.
- 1924 - emergence of big power in the Novosibirsk region. A tab of the Novosibirsk right-bank combined heat and power plant (combined heat and power plant - 1).
- March, 1926 - the first two 500 kW units on CHPP-1 are put into operation.
- April, 1931 - the order "Energocentra" No. 158 for the management of power economy of Zapadno - Siberia in Novosibirsk created district power management of Zapsibenergo which part also power objects of Kuzbass were.
- January, 1933 - management of the Novosibirsk city power supply networks is created.
- 1935 - on the Novosibirsk CHPP-2 (left-bank state district power plant) is started the 1st 24 thousand kW turbine unit. The construction of the power transmission line of 35 kV. connecting combined heat and power plant - 1 and combined heat and power plant - 2 on parallel operation is finished.
- 1936 - the foundation of central heating of Novosibirsk is laid - operating first heating main laid from CHPP-1 entered a system. The central dispatching service "Zapsibenergo" is formed.
- January, 1937 - is created the Energonadzor.
- October, 1942 - is put into operation the first 25 thousand kW turbine unit on CHPP-3.
- October, 1943 - on CHPP-3 is entered the second 25 thousand kW turbine unit.
- June, 1944 - by the order NKGES No. 103a of Zapsibenergo it was transformed to REU "Novosibirskenergo".
- September, 1946 - Management of thermal networks "Novosibirskenergo" is created.
- 1953 - was included into a system acting the first 12 thousand kW unit on the Novosibirsk CHPP-4.
- 1954 - are put into operation of the three first of the 12 thousand kW unit on the Barabinsk state district power plant. The Production Repair Shop (PRS) is created. The transmission line of 110 kV Novosibirsk - Barabinsk - Omsk is put in operation that provided transfer of the Trans-Siberian railroad to electric draft and created conditions for the broad centralized electrification of agriculture of the Novosibirsk region.
- October, 1955 - Novosibirskenergo joined in a parallel with Omskenergo.
- 1956 - the Barabinsk power supply networks are created.
- November, 1957 - is started the first 57 thousand kW unit of the Novosibirsk hydroelectric power station.
- March, 1958 - Management of the electric networks is reorganized into two enterprises: Novosibirsk city power supply networks and East power supply networks.
- 1959 - is put into operation the last, 7th NGES unit. The hydroelectric power station reached the design capacity of 400 thousand kW.
- January, 1960 - it is accepted on balance of power supply system of combined heat and power plant - 4, and in the late sixties at combined heat and power plant - 4 three 100 thousand kW turbine generators are put into operation.
- November, 1960 - the transmission line of 220 kV Novosibirsk - Belovo is put into operation. This power transmission line integrated the Novosibirsk and Omsk power node with the Kuzbass power supply system, was a basis of creation of the Siberian power consolidation. The heat conductor which for the first time connected the left and right coast of Ob through the new utility bridge is built. It gave rise to vigorous development of heating systems of the city. Expansion of combined heat and power plant - 2 was made, 4 turbine generators on 50 thousand were entered into work. Kw. Power of combined heat and power plant by 1965 reached 324 thousand kW.
- March, 1964 - the enterprises of the electric networks are created: Ob, Cherepanovsky, Chulym and Tatar. The Barabinsk power supply networks are renamed into the Western electric networks.
- January, 1968 - the Karasuksky electric networks are created.
- 1972 - entered a system acting the first in power supply system objects of extra-high voltage - the power transmission line of 500 kV and substation Dawn. As a result of the carried-out reconstruction and upgrade of hydraulic turbines the installed capacity of NGES increased up to 455 thousand kW. The Novosibirskenergospetsremont enterprise (NESR) is created
- 1974 - expansion CHPP-3 is complete. The station reached the power of 573 thousand kW.
- 1978 - the power transmission line - 500 kV Novosibirsk - Barnaul - Rubtsovsk through which the Novosibirsk power supply system and the Siberian power consolidation were a part of the USSR Power pool system is started.
- December, 1985 - is entered the first 180 MW power unit of the Novosibirsk CHPP-5.
- April, 1986 - Motor transportation enterprise (ATP) is created.
- July, 1989 - the directorate of CHPP-6 under construction is created.
- July, 1992 - it is created "Новосибирскэнергоснабкомплектоборудование" (NESKO)
- 1993 - privatization of the enterprises of power supply system is carried out and JSC Novosibirskenergo is formed.
- December, 1994 - is included the 5th block on CHPP-5. Total power of the station reached 900 thousand kW.
- March, 2001 - to 70-year anniversary of formation of power supply system the power of the Novosibirsk power plants makes 2537 thousand kW. The power supply system develops more than 12 billion kWh at the power plants. electric power. Novosibirskenergo locates an extensive transmission line network and heating mains. Extent of the electric networks is 49865 km., thermal - more than 300 km.
- 2002 - the Restructuring program of JSC Novosibirskenergo is adopted.
- December, 2003 - installation of a reverse osmosis on CHPP-2 is put into operation.
- December, 2003 - the new turbine of 30 MW at the Barabinsk combined heat and power plant is installed.
- May, 2004 - the third water-cooling tower on CHPP-5 is put into operation.
- September, 2004 - is put into operation the 6th power unit on CHPP-5.
- December, 2004 - the new turbine of 110 MW on CHPP-3 is put into operation.
- April, 2005 - is put into operation the new hydrogenerator of 65 MW on the Novosibirsk hydroelectric power station.
- July, 2005 - the electric substation Chelyuskinskaya is put into operation.
- December, 2005 - the electric substation Pennant is put into operation, the step-down PNS-11 pump station is put into operation.
- May, 2006 - is put into operation the 5th 65 MW hydraulic unit on the Novosibirsk hydroelectric power station.
- May, 2007 - the electric substation "Thermal-2" is put into operation.
- September, 2007 - is put into operation ash dump No. 2 of CHPP-5, new heating mains on Leskov St. and Ordzhonikidze St. are constructed.
- October, 2007 - start-up of the new central heat distribution station and a heating main in the settlement the Backwater.
- November, 2007 - the substation Olovozavodskaya is put into operation after reconstruction.
- December, 2007 - the substation Library is put into operation after reconstruction.
- December, 2008 - Reconstruction of ash dump No. 2 of CHPP-5 is complete, PS "Berdsk" is put into operation
- August, 2009 - Launch of the new step-down PNS-10 pump station
- July, 2011 - Within the reorganization of Society designed to separate the company on types of activity since July 1, 2011 JSC SIBECO became the legal successor of JSC Novosibirskenergo regarding heat and power supply in wholesale market of energy and power. Need of holding these procedures is caused by execution of the federal legislation "About Power Industry" on which since 2011 in the industry there is impossible any affiliation between networks and generation. With respect thereto the decision on selection from the structure of JSC Novosibirskenergo of 2 societies - JSC Generation, with the subsequent accession of society to JSC SIBECO and JSC Elektromagistral was made.