The master distribution power plant Topar (earlier - the Karaganda GRES-2) is located in 3 km from the item Topar Karagandinskoy of the region of the Republic of Kazakhstan. Construction of power plant began in April, 1954. In June, 1962 the first turbine generator was put into operation, and in September, 1968 the last was put into operation. The state district power plant is included into the Integrated power grid of Kazakhstan (EEC). The developed electric power goes on a covering of electric loads of the enterprises of Group in the Balkhash, Zhezkazgan and Karaganda region. The surplus of the electric power is on sale in the electricity market of Kazakhstan. Are a part of the capital heatpower equipment of state district power plant: seven steam turbines and sixteen steam power boilers.