The Best Soft company offers on the market of automation of the energy industry enterprises the software product "to 1C: Power. Management of the distribution grid company" which in fact is the solution on automation of ERP systems in the distribution grid companies.

The structure of Enterprise resource planning reflects logic of creation and interaction of business processes of the enterprises of the power industry, to each of which there corresponds a certain functional module (Fig. 1).

Fig. 1 Structure of Enterprise resource planning of the distribution grid company

The main functional objectives are implemented in three interconnected circuits – production, management accounting and a guidance loop by the financial and economic activity (FEA).

Production circuit

In the software product "1C: Power. Management of the distribution grid company" the following production tasks are implemented:

Electric power transport

  • Accounting of volume of transit of the electric power on the networks which are not belonging to the distribution grid company;

  • Accounting of volume of electric power transmission to power supply companies;

  • Reporting on the basis of information on the executed transfer and transit of the electric power.

  • Database maintenance:
    • consumers of the electric power: legal entities and physical persons;
    • commercial and technical points of accounting;
    • measuring complexes of consumers;

  • Flexible configuration of schemes of connection of subconsumers;

Calculation of supply of electricity for metering devices with different schemes of connection of subconsumers (including on multi-scale instruments of accounting);

  • Calculation of supply of electricity using different methods of calculation: on a fixed value, on power, on an average;

  • Accounting of acts of underestimation and recalculations;

  • Calculation of volume of losses at consumers;

  • Formation of balances of the electric power;

Technology accession

  • Accounting of requests for technology accession;

  • Maintaining history of statuses of requests;

  • Accounting of specifications and agreements on technology accession and calculation of their cost;

  • Accounting of inspection reports of power stations, accomplishment of specifications, about implementation of technology accession, differentiation of balance sheet accessory, differentiations of operational responsibility (an aktirovaniye of works on technology accession)

  • Maintaining history of statuses of agreements on technology accession;

  • Formation of the summary reporting and printed forms of specifications, agreements and acts.

Metrology

  • Maintaining the accounting base containing information on all measuring instruments which are in operation or stored and introduction of data on change of their technical condition;

Planning of carrying out checkings and calibrations of measuring instruments and measuring channels;

  • Accounting of results of metrological works;

  • Formation of documentation regulating accounting of the metrological equipment according to requirements of Federal law No. 102-FZ "About ensuring unity of measurements";

  • Formation of the summary reporting under measuring instruments and measuring channels.

Certification of the equipment

  • Accounting of hierarchy of the electric network of the organization;

  • Accounting of the installed equipment;

  • Planning of actions for maintenance of the equipment (diagnostics, repair, engineering certification);

  • Accounting of history of movement of each object of certification;

  • Maintaining unlimited number of characteristics of the equipment with a possibility of the further analysis.

Energy saving

  • Planning of actions of decrease in power losses;

  • Calculation of planned power and economic effect of holding an action;

  • Formation of the program of energy efficiency of divisions of the enterprise and organization in general;

  • Monitoring of holding actions of decrease in power losses;

  • Fixing actually indicators of decrease in power losses from holding actions;

  • Formation of the summary reporting.

Production business processes are connected with tasks of the FHD block (Fig. 1) through the tasks defining business planning of the power grid enterprise: the investment management, control of motor transport, purchase management, interaction with consumers, contract management and conducting claim and claim activity.

Management accounting

In the Managerial accounting block, software product "1C: Power. Management of the distribution grid company" the following functionality is implemented:

Interaction with consumers

  • Acceptance, classification, preprocessing and registration of the addresses received from consumers;
  • Processing and transfer on processing of the address;
  • Execution and control of execution of actions for processing;
  • Completion of processing, consumer notification.

Investment management

  • Formation of a medium-term investment program (~ 5 years);
  • Formation of a short-term investment program (~ 1 year);
  • Correction of a medium-term investment program;
  • Correction of a short-term investment program;
  • Implementation of an investment program;
  • Reporting about the actual execution of a short-term investment program.
  • Contract management
  • Formation of the agreement;
  • Approval of the agreement;
  • Agreement performance;
  • Agreement completion.

Claim and claim activity

  • Claims activities;
  • Claim work;
  • Executive office-work.

Control of motor transport

  • Planning and use of means of mechanization and transport;
  • Accounting of fuel and lubricants and spare parts;
  • Maintenance and repair of the motor transport;
  • Accounting of violations of traffic regulations and road accident.

Purchase management

  • Formation of requirements;
  • Formation/correction of PZ;
  • Carrying out purchases;
  • Signing of the contract;
  • Agreement performance.

Integration of subsystems

Integration of subsystems of different business processes in "1C: Power. Control of the distribution grid company" is exercised with respect for the following principles:

  • single database,
  • community of the normative reference information,
  • automatic filling of the adjacent blocks given on the basis of information;
  • separation of powers on business process steps;
  • reporting according to different subsystems;
  • control over compliance of information in adjacent blocks.

These principles are implemented for ensuring interaction of business processes, in particular:

  • asset management – management of electric power transport – technology accessions, control of electric power transport – asset management – energy efficiency, interaction with consumers – technology accessions – accounting;

  • certification – asset management – metrology;

  • technology accessions - the investment management – purchase management – contract management – accounting;

  • asset management - management of motor transport – inventory management – accounting;

  • certification – asset management – purchase management – contract management – treasury – budgeting.

Thus software product "1C: Power. Management of the distribution grid company" represents the solution for complex business process integration in the single automated system executed in a format of the finished modular product configured under needs of a certain type of the enterprise.

Use of modular approach is one of pacing factors of design of the modern systems tending to increase in an integration scale up to the level of the ERP systems allowing to implement the organizational strategy of production focused on continuous balancing and resource optimization of the enterprise.

Advantages of the solution

Software product "1C: Power. Management of the distribution grid company" it is implemented in full accordance with methodology of ERP on the Russian technology platform "1C:Enterprise 8" which meets requirements imposed to corporate information systems such as:

  • Performance. Stress testing by a technique of APDEX within which simultaneous operation of several thousand users was modelled is held and several tens of millions of entries in tables of databases were processed;

  • Flexibility. The open architecture of the 1C:Enterprise 8 platform and also the automated solution on design allow quickly and with the broad range to make the changes arising in connection with requirements of the legislation, correction of business processes and structures of the enterprises;

  • Availability of specialists. At the moment in the market there are certified specialists for support of corporate solution at the 1C:Enterprise 8 platform;

  • Ownership cost. Due to bigger flexibility on making changes and development in comparison with foreign analogs of ERP systems the regular costs connected with support of operability of an information system are reduced.

Thus "1C: Power. Management of the distribution grid company" is the software product allowing to automate in a complex activity of the electric grid companies.

2015

1C: Power. Management of the distribution grid company — the application solution which for June, 2015 is a main product of import substitution of automated control systems for the enterprise, covering the main guidance loops and accounting in the distribution grid companies (DGC).  The product is implemented in structures of Rosseti holding, Penza City Electric Supply Company Ltd, JSC YuTEK-Regionalnye seti  and in other electric grid companies.

Information on the developer

The Best Soft company specializes in creation of software products and accomplishment of complex projects on automation of power and manufacturing enterprises. For years of work more than 60 large projects are successfully implemented, software products  of a line "are developed by 1C: Power" which for June, 2015 includes:

  • 1C: Power. Management of the distribution grid company -  the application solution which for June, 2015 is a main product of import substitution of ERP systems, covering the main guidance loops and accounting in the distribution grid companies (DGC).  The product is successfully implemented in structures of Rosseti holding, Penza City Electric Supply Company Ltd, JSC YuTEK-Regionalnye seti  and in other electric grid companies.

In addition to drawing software products a number of original configurations, such as is developed:

  • "Best Soft: Sales accounting of thermal energy" will allow to automate the business processes connected with charge and conducting settlement of the supplier of utilities with consumers and also to quickly carry out the analysis of receivables and to take measures for its reduction.

  • "Best Soft: Billing" will provide exact and operational calculation of charges to subscribers for consumption of utility resources, is intended not only for the enterprises of a housing and utilities sector, but also for the companies of the oil and gas and fuel spheres, the telecommunication enterprises and other companies which in large quantities are making out bills for the services.

  • "The energy efficiency and power providing manufacturing enterprise" will allow: implement the operational analysis of the equipment of the enterprise by consumption of energy resources; make accounting of results of an energy audit and control execution of instructions, plan actions of decrease in losses, calculate power and economic indicators of the program of energy efficiency, create the power passport of the enterprise.

  • Best Soft: The metrology allows to automate the main business processes of metrological service of the enterprise: accounting and the analysis of a status of the metrological equipment, formation of requests for carrying out checkings/calibrations of means of measurements / measuring channels, costs planning on carrying out metrological works, registration of the fact of their carrying out, unloading of information about carried out to checkings to the AIS "Metrkontrol", formation of diagrams of metrological works, planning and registration of TO and repairs of the metrological equipment.

Complex automation of the enterprises using software products of Best Soft allows to increase consumer service quality and to expand a range of services and also to provide convenient interaction with other market participants, to lower expend and to optimize a control system and accounting.