Developers: | SAP SE |
Technology: | EAM, ERP |
SAP Multiresource Scheduling is schedule system and distributions of human and production resources at the level of jobs and groups: assessment of qualification, availability, loading and other parameters.
SAP MRS — the effective solution for service maintenance, maintenance and project management providing:
- human resources management
- object management of infrastructure
- management of working time
- management of the production technology
- the manual, automatic and optimized planning
- integration with geographic information systems
- integration into mobile devices
SAP Multiresource Scheduling is integrated with key processes of SAP solutions:
- SAP HR
- SAP PM/CS
- SAP PS
- SAP cProjects
- SAP CRM Service
Overview of the scenario Multiresource Scheduling
General architecture
Main Functions
Management of employment
- Planning and distribution at the level of jobs
- Balancing of employment by replanning
- Adding of resources
- Workload at the level of groups
** the Planned and unplanned orders ** Availability of employees (the planned busy time, absence, presence)
Monitoring
- Execution control
- Status of availability of tools
Skills management
- Integration with SAP of HR/qualification MRS
Integration with management of working time of personnel
- The bidirectional interface with SAP HR (absence, presence, substitution)
- Information on changes from SAP HR
Graphic panel of planning
- Functional panel of planning on the basis of SAP GUI
- Simple panel of planning on the basis of a web user interface
Optimizer
- The mechanism of the optimizer creates daily planning on the basis of parameters of "costs"
Integration into mobile devices.