Customers: OMZ (JSC OMZ)
Contractors: IBS Platformix Product: Projects of creation of complex IT infrastructureProject date: 2013/02 - 2013/04
|
The IBS Platformix company executed the complex project on the infrastructure organization of office of OMZ company (JSC OMZ), the press service of integrator reported on April 25, 2013.
Background
Relocation of office JSC OMZ to Central federal district of Moscow caused creation of a structured cabling system and a power supply system of jobs at new office and also a full range of works on the equipment of the server room as the engineering systems. IBS Platformix made also physical movement of the infrastructure equipment, equipment of server premises, meeting rooms, including the equipment of a video conferencing and jobs of employees of the customer.
Solution and equipment
At installation of systems at new office the international and Russian standards were considered. Besides, during creation of SCS in addition to the commonly accepted regulations requirements of the customer are also considered: universality (compatibility with the equipment of any producers), scalability (development and changes of network with the minimum costs).
Providing fire protection of premises, in the server room placed the automatic installation of gas fire extinguishing operating in the automatic mode.
The conditioning system constructed according to the scheme of reservation N+1 supports necessary, for operation of the computing equipment, temperature and humidity. A system is expected round-the-clock operation and exact maintenance of temperature condition indoors.
The office is equipped with the system of a video conferencing, it is successfully applied to the organization of distance learning of employees.
"This project is indicative from that point of view that in it several directions of development and management of IT infrastructure are bound at once. During the project, we could implement our main principle - irrespective of project scale, as for basic IT infrastructure, the standard solutions practiced in IBS Platformix allow to reduce other things being equal considerably terms of its implementation due to availability of ready-made solutions and the fulfilled processes both in the contractor, and on section "the system integrator – the customer". Thanks to this approach the customer could control easily the project at any stage, without worrying about emergence of contingencies in essential sizes", – Marina Merkulova, the director of the department of project management of IBS Platformix noted.