RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Confectionery House East (CHE) (DPC projects of upgrade) 2

Customers: Confectionery House East (CHE)

Contractors: Utilex
Product: DPC Projects of creation and upgrade

Project date: 2011/04

Due to the increasing requirements on management of technology processes and key business processes one of the largest confectionery holdings of Russia - the Confectionery house East - had a need of consolidation of the systems of engineering infrastructure, accumulation of information capacities and upgrade of the existing equipment. Within this Utilex project carried out a complex of works on preparation of the premises and to formation of the environment for upgrade of DPC on APC technologies, implemented design and installation of the systems of uninterrupted power, installed the systems of the guaranteed power supply of the increased efficiency and density of power of Symmetra PX on 160 kW. Also complex upgrade of a conditioning system was carried out – the installed earlier household equipment was replaced with industrial specialized installations of ARS by Scheider Electric and the structured cabling system on the basis of components of AMP NETCONNECT company is installed. Provides to SCS capacity of 10 Gbps and below and has the term of warranty service from the supplier of 25 years. The project was executed in a short time without stopping production and business processes of the enterprise.