Customers: Mobicom Khabarovsk Khabarovsk; Telecommunication and communication Contractors: Utilex Product: DPC Projects of creation and upgradeProject date: 2007/01
|
As a core of the project infrastructure based on APC InfraStruXure of types "A" and "B", using uninterruptible power supply units of Symmetra with a power from 16 kVA to 80 kW was used. All equipment of infrastructure (the UPS, power distribution panels, climate control, etc.) is connected in a single system of management and monitoring.