Customers: Power machine-building Alliance (EMAlliance) Taganrog; Mechanical engineering and instrument making Contractors: IBS Platformix Product: Projects of IT outsourcingProject date: 2013/05
|
The IBS Platformix system integrator performed physical moving of a computing cluster of data center of Power Machine-building Alliance company, one of the largest Russian power engineering companies. In a project deliverable it was succeeded to reduce operating costs of the equipment significantly.
The EMAlliance company was included into structure of Power Machines holding in which own DPC functions. The premises of DPC allowed to contain the computing equipment from data center EMAlliance that considerably reduced costs for service and ensuring smooth operation. For project implementation only the experienced carrier ready to guarantee safety of the equipment and correctness of installation in the new premises was required.
Within the project preliminary inspection of the transported equipment was performed, dismantling and packaging, actually, moving and installation of equipment is executed and it is permanent in the new premises. In conclusion of moving specialists of IBS Platformix checked basic operability of the equipment. Moving was performed generally in time off that allowed to provide functioning of office in an operating mode.