DPCs of FGC UES equipped with complexes with technology of direct liquid cooling

Customers: FGC UES - Federal Grid Company of the Power pool system

Product: DPC of IT Energy Kitay-gorod

Project date: 2014/04  - 2019/09

2019: Equipment of DPC technology of liquid cooling

On October 17, 2019 it became known that the Inpro Tekhnolodzhis company equipped DPC of FGC UES with computing and communication complexes with technology of direct liquid cooling thanks to which it is possible to cut down operating costs for 30% in comparison with traditional solutions.

The Inpro Tekhnolodzhis company started project implementation in 2018 after consideration of technology by technical services of PJSC FGC UES. In a work progress it was carried out load tests and heat tests in a heat chamber. According to the results of works samples of computing and communication complexes which are placed in DPC of DZO PJSC FGC UES - IT Energy Service LLC were created.

The main request of PJSC FGC UES within the project – optimization of the existing IT resources and creation of technology for operational deployment of computing resources without considerable investments in IT infrastructure.

File:Aquote1.png
The solution which would provide the increased reliability of functioning was necessary and reduced operating costs of server and telecommunication equipment,
explained Kotelyukh Oleg, the managing partner of Inpro Tekhnolodzhis LLC
File:Aquote2.png

Thanks to technology of direct liquid cooling it is possible to cut down operating costs for 30% in comparison with the traditional solutions based on air cooling.

File:Aquote1.png
In addition to cost reduction on the electric power, among characteristics there are developments: economy of the place when preserving computing power, security for the person and the environment. And also providing thermostable operation mode of electronic components and, as a result, increase in terms of their service,
told Oleg Kotelyukh
File:Aquote2.png

Growth of requirements for computing power is connected with digitalization of the enterprises of the fuel and energy industry and to transition to modern technologies of creation of intelligent networks and digital substations. The commission of PJSC FGC UES recommends transition to creation of prototypes of computing and communication complexes with their subsequent operation on objects of the company.

Use of development corresponds to an adopted agenda of the innovative development of PJSC FGC UES for 2016-2020 with perspective till 2025 and the list of the perspective innovation directions, such as: "Remote control and security", "Management of reliability and assets", Digital substation.

2014: Placement of the equipment in DPC

  • placement of the equipment in DPC Kitay-gorod;
  • operation of the special engineering systems
  • placement of server and telecommunication equipment in DPC Kitay-gorod