RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Croc completed creation of engineering infrastructure at CSKA stadium

Customers: CSKA OF PFK

Contractors: Croc
Product: Complex projects of creation of the engineering systems

Project date: 2015/05  - 2016/09

CROC acts not only as the sponsor of PFK CSKA, but also is one of contractors in construction of new stadium of club. The engineering infrastructure of the PFK CSKA new stadium designed by specialists of the company includes 43 engineering subsystems on 30,000 seats, including the office building 142 meters high, hotel, the parking, a complex of entrance groups and galleries.

Besides, experts of CROC design a low-current engineering circuit where telecommunication systems, sound reinforcement systems, telebroadcastings and security enter. And also automation systems and schedulings, solution for monitoring and management of the engineering systems of all complex.

Project Results

On September 12, 2016 the Croc company announced creation of engineering and audiovisual infrastructure for stadium of professional football club CSKA on 30 thousand viewers.

PFK OF CSKA, (2016)

Within the project engineers of the company contractor set more than 40 subsystems for a complex of buildings of the arena of CSKA as a part of which stadium, the business center, hotel and the parking on 1.4 thousand places[1].

Security systems, communication and telecommunications enter an engineering circuit. For monitoring and management of the engineering systems of a complex of buildings of the arena of CSKA automation systems and schedulings are installed. In addition experts of the contractor mounted the multimedia systems for the press center, the systems of antenna gain and IP-TV (Internet Protocol Television, digital television).

The lighting system for competitions and trainings is created at any time. It provides conditions for a TV broadcast of matches. Two video screens with a total area of 214 m ² are installed.

For physically disabled people a barrier-free environment is created. On stadium 176 special chatter boxes of an operational call of the steward are installed.

For security of visitors of stadium 540 cameras integrated into a single system of city video surveillance are mounted. For protection of visitors of stadium the complex of customs devices is organized:

  • introscopes,
  • stationary and manual metaldetectors,
  • customs mirrors,
  • explosion-proof containers and so forth.

In the territory of a complex sense lights and chatter boxes on a case of carrying out evacuation are installed.