Customers: Osobye ekonomicheskiye zony, JSC
Contractors: NVision Group Product: Projects of creation of complex IT infrastructureSecond product: DPC Projects of creation and upgrade Project date: 2014/10
Project's budget: 150 million rubles. руб.
|
NVision Group designed and constructed the 400 kVA DPC for Special economic zones branch of JSC in St. Petersburg. Resources of the computer system located on the platform Neudorf are leased to residents to the SEZ and other state and commercial organizations. The grand opening of DPC was held in October, 2014. The project budget made 150 million rubles.
The project was implemented by specialists "NVision there is a Northwest", Nvision Group branch in St. Petersburg. They performed all complex of works – from design of the machine hall and the engineering systems before installation, testing and delivery in commercial operation.
"The main goal of our economic zone – to create the base for promotion of innovations and high technologies. We hope that start of data center will help many companies to realize the daring ideas, to put on the market new products and services. Privileges for lease of computing resources are provided to residents of the SEZ, but we offer attractive terms for all potential clients of DPC – business and state companies", – Valery Cherepanov, the acting head of Special economic zones branch of JSC in St. Petersburg notes.
"Thanks to new data center residents of the special economic zone received reliable elements of IT infrastructure with the minimum costs. Information systems at the companies become more and more, and all of them demand computing resources. Besides, demand for services of domestic DPCs is stimulated by changes in the law "About Personal Data", – Dmitry Svetlov, the branch director "NVision — the Northwest" says.
Technical details of the project
The total area of DPC – 200 sq.m, from them about 120 sq.m occupies the machine hall. In racks of data center about 1500 units of ADP or telecommunication equipment can be placed. The settlement consumed electric power – 400 kVA.
The complex meets the Russian and international standards on power supply, conditioning, fire and physical security. Availability of DPC makes 99.982% that corresponds to the Tier III level on Uptime Institute classification.
The core of data center is formed by the equipment and software of IBM, in infrastructure component parts Juniper Emerson Tripplite ABB Schneider , etc. are used.