Customers: Mosmetrostroy, JSC
Contractors: Impulse IVC Product: 1C:Enterprise 8. Management of the construction organization (1S:USO)Second product: 1C: Estimate Project date: 2008/07 - 2015/09
Number of licenses: 50
|
Content |
September 30, 2015.[1] is implemented[2] of a system of estimate pricing "1C: Estimate 8" in JSC Mosmetrostroy.
JSC Mosmetrostroy, 2015
Maintenance:
- Delivery and installation of the delivery of ITS to a workplace of the user is monthly performed
- Works on updating of the platform and standard configurations, diagnostics of a status of information base, creation of archive copies are monthly performed
- Consultation on methodical questions of work with the program of 1C is performed
- Description
Contractors (subcontractors) keep account of installation and construction works and calculation of cost of SMR in the software uniform base "1C: Estimate 8", edition 2.0, located on the server of JSC Mosmetrostroy through remote terminal access, with separation of access rights into documents.
The Following Tasks Were Performed:
- Consultations on the choice of the software and options of its maintenance
- Sale of the selected software products
- Delivery of software products in office of the customer
- Software installation on the customer's computers
- Collecting and requirement analysis of the customer to an automated system
- Planning of stages of works, drawing up job schedule
- Methodical ensuring specific features of accounting and management in the automation system (the requirement to adaptation)
- Technical implementation of specific features of accounting and management in the automation system (adaptation)
- Initial settings of standard/industry solution (program) to start accounting
- Input of opening balances / the help when entering opening balances
- Data transfer from the previous automation systems
- Training in group at office of the customer
- Installation and setup system and network program obespechenbz/
The Following Functions Were Automated:
- Different industry specifics
- Construction
- Estimate pricing, release of estimate documentation
As a result of implementation of the program all design estimates on a construction object are stored in electronic form, with a possibility of maintaining analytical reports on financing of the project for Management personnel of JSC Mosmetrostroy.
Notes
- ↑ [http://www.1c.ru/rus/partners/solutions/solution.jsp?SolutionID=342737 System implementation of estimate pricing "1C
- ↑ : Estimate 8" in JSC Mosmetrostroy]