The name of the base system (platform): | 1C:Enterprise 8.3 |
Developers: | Impulse IVC, Ericos |
Last Release Date: | 2023/07/26 |
Branches: | Construction and Construction Materials Industry |
Technology: | Accounting systems |
Content |
2023: "1C: Estimate 3," revision 3.1. Removal of boxed deliveries from sales
The firm 1C"" announced on July 26, 2023, the release of revision 3.1. application solutions. " 1C:Enterprise 8 Estimate 3 "(hereinafter 1C: Estimate 3) - a joint branch solution of 1C, Development Centers and Ericos-CSP GC, Impulse IVC developed on the platform.1C: Enterprise "version 8.3
"1C: Cost Estimate 3" is a comprehensive solution designed to draw up, calculate, storages seals construction and estimate documentation: local and object cost estimates, summary cost estimates, resource expenditure reports (M-29), resource statements, certificates of work performed (KS-2), certificates of cost of work performed (KS-3), etc., for all construction subjects. The product is included in the software package "" and 1C:BIM 6D, as an estimate subsystem, in the program 1C:ERP Construction Organization Management"."
The 1C: Cost Estimate 3 program is suitable for automating the activities of the following organizations:
- investment and construction companies;
- developers;
- construction customers;
- capital construction departments;
- design organizations;
- construction contractors;
- regional centers for pricing in construction;
- expert review bodies.
An external component can be connected to the "Estimate 3" configuration to access the TEP data , FEP, OEP, TSN regulatory base service. External regulatory bases are located in an external one, the storage access service to which can be launched centrally or locally at each user location.
The following options are provided to the "Cost Estimate 3" configuration users:
- Preparation of a set of design and estimate documentation in accordance with the current regulatory requirements: local, object, summary estimates;
- Determination of construction cost by the basic method using cost estimates and regulatory bases in the 01.01.2000 price level;
- Determination of the construction cost by the resource method taking into account the actual production conditions and the current range of construction resources (current prices, replacement of resources from estimates to current ones);
- Determination of construction cost by basic index method using conversion factors (indices) to both total cost and cost elements;
- Determination of the cost of construction by the resource-index method using estimated standards, estimated prices of construction resources in the basic price level and simultaneous application of information on estimated prices placed in the FSIS CS, as well as indices of change in the estimated cost to the components of unit prices in the basic price level;
- Creation of resource lists necessary for performance of works on any type of estimate (construction, facility, type of works) for operational planning of materials, mechanisms and labor costs supply;
- Keeping records of works performed and actual resources used (forms KS-6, KS-3, M-29);
- Simultaneous use of several regional estimate and regulatory bases, creation and maintenance of own regulatory framework.
The 1C: Estimate program allows you to solve the following tasks:
- Prepare, adjust, store and update estimate documentation;
- Create local, object and summary estimates in the section of construction facilities;
- Estimate calculations using various methods: basic, basic-index, resource and resource-index method;
- Use an array of regulatory data (TEP, FEP, OEP, etc.) for drawing up estimate documentation;
- Apply information on estimated prices placed in the FSIS CS, as well as indices of change in the estimated cost to the components of unit prices in the basic price level;
- Create and edit an individual (corporate) estimate and regulatory framework;
- Promptly review the necessary methodological literature and technical parts;
- Create and edit your own fragments and templates;
- Perform calculations in accordance with the methodology for determining the cost of construction products on the territory of the Russian Federation (MDS 81-35.2004), the methodology for determining the estimated cost of construction, reconstruction, overhaul, demolition of capital construction facilities, work on the preservation of cultural heritage sites (monuments and) stories cultures of the peoples of the Russian Federation on the territory of the Russian Federation (Order Ministry of Construction 421/pr, Order of the Ministry of Construction 557/pr) and the methodology of TSN; Moscow
- Make full-fledged settings that reflect the specifics of each region and industry;
- Use the basic and actual resource prices accounting unit;
- Work with pre-configured reference books that take into account the specifics of estimated pricing under MDS;
- Use and calculate overhead costs and estimated profit, taking into account the coefficients according to the letters of relevant ministries and departments;
- Maintain estimate documentation by parts, sections and subsections;
- Calculate the necessary results at any level - item, section, estimate, by type of work;
- Work with the composition of estimates, unaccounted resources, equipment and calculations in current prices;
- Store arbitrary format files in the local estimate;
- Perform group work with resources, positions, amendments, coefficients and numerical parameters in estimate documents;
- Edit amendments to the conditions of work performance, accruals to positions (for tightness, harmfulness, energized work, transportation and procurement costs, etc.);
- Work with the composition and replacement of resources;
- Work with external sets of recalculation indices and catalogs of current resource prices;
- Keep records of the limited costs of the amount and as a percentage of the budget results, with the possibility of setting any number of limited costs to the estimate document, as well as creating your own method of calculating limited costs;
- Take into account the work performed in the context of construction facilities and local estimates, recalculate the certificates at the current price level;
- Use a variety of output forms covering the entire range of cost estimates and work records, resource sheets, registers, KS-2 acts, KS-3 certificates and other output forms;
- Enter certificates on balances;
- Keep records of current prices other than the price level of the local estimate;
- Compiling a market analysis;
- Carry out an expert review of the estimate documentation to automate the activities of regional pricing centers in construction and other design institutes;
- Exchange cost estimates in ARPS 1.102 and 2.0, EstML, KENML, Grand Cost Estimate (gsfx), Cost Estimate 5D, Cost Estimate Plus, Cost Estimate Ru and others;
- Carry out automatic exchange with accounting systems, scheduling systems and other estimate systems;
- Integration with the Renga BIM system.
Among the features of the program:
- User workstation with a single work window with all estimate documentation in the section of construction facilities;
- Pre-configured and filled limited costs and accrual parameters;
- Working with the resource directory;
- Simple interface of the document "Local cost estimate," allowing to perform basic actions directly from the form;
- The ability to disclose the structure of the estimate, resource part, results or data on HP and JV;
- Detailed information on the cost estimate document item;
- Accounting of completed works with quick access to actual and normative consumption of resources, prices for resources and conversion indices directly from the form of the document "Certificate of Completed Works";
- Simple forms of documents "Object estimate" and "Summary estimate";
- Intuitive form of group processing of cost estimate items and work completion certificate;
- Possibility of generating estimate documentation based on data of information models (BIM-models) of capital construction facilities;
- The ability to view the structural objects in the model for the selected item in the local cost estimate through the display or selection of objects;
- The ability to view objects in the model through selection and display through selection and display;
- Full-fledged functions of expert review of estimate documentation;
- Exchange of estimate documentation with customers and construction contractors;
- The possibility of machine learning of the data model using AI to further check the quality of filling in the details of the local estimate position (for example, when importing estimate documentation);
- Display options for filling in details with probability for correct filling in the estimate item;
- Updating the machine model for items of the entire estimate makes it possible to fill in the item details ("Determinant" and "Type of regulatory collections") taking into account the highest probability;
- Checking the correct filling of the details of the "Determinant" and "Type of regulatory collections" positions, taking into account the probability according to machine learning data.
"1C: Cost Estimate 3" provides data exchange with solutions:
- "1C: Accounting by Construction Organization";
- "1C: Construction Contractor. Financial Management ";
- "1C: Construction Contractor. Construction Production Management. "
At the same time, the product is closely integrated with ERP systems, in particular:
- data exchange with "1C:ERP Enterprise Management" and "1C:ERP was implemented . Holding Management ";
- The solution is integrated as an estimate subsystem in the "1C:ERP Management of the Construction Organization."
As a result of implementation "1C:Enterprise 8. The 3 "estimate achieves the following results:
- Significant reduction of time for preparation of estimate and accounting documentation;
- Ensuring the process of passing the examination of the reliability of the estimated cost of the construction object;
- Prompt receipt of complete information on the scope and cost of work performed in the context of construction projects, contracts, contractors, contractors for any period of time, as well as as of the current date;
- Centralized storage of estimate documentation, quick access to a single information space of estimate documentation from any device, quick examination of documentation;
- Share regulations, index catalogs and current prices, reduce costs through centralized updates;
- Obtaining the entire list of reporting documents in various sections in a convenient form (local estimates, object estimates, summary estimates, certificates of work performed in the form of KS-2, certificates of the cost of work performed in the form of KS-3, certificates of writing off materials in the form of M-29, material requirements lists, material consumption lists);
- Reduce time spent exchanging documents with accounting and other departments of your organization.
Improving the quality of contractual relations, the possibility of adjusting the contractual price, forming printed forms.
The development of revision 3.1 took into account the experience gained during the implementation and operation of the 1C: Cost Estimate 3 solution at the following enterprises: PAO Severstal, BI-Holding LLP, Mosmetrostroy OJSC, Energoremont LLC, KIK LLC and many others. The software product "1C: Estimate 3" has also passed the certification "1C: Compatible."
2015: 1C:Enterprise 8. Estimate Revision 3
Product "1C:Enterprise 8. Cost Estimate Revision 3 "is intended to automate the design and estimate documentation preparation process in accordance with the current regulatory requirements.
The main industry functionality of the program:
Preparation of local and object estimates by the basic index and resource method, taking into account the specifics of individual regions; Preparation of summary cost estimates for chapters in accordance with construction type;
- Accounting of actually performed works (KS-2 form), resource consumption "according to the norm" and "in fact";
- Full functionality for working with the estimate documentation tree, recalculating the results at the level of position, section, estimate, possibility of group processing of items and sections of estimate documents;
- Use of ready-made estimate and regulatory databases;
- Maintaining its own regulatory framework;
- Maintain a resource catalog;
- Automatic application of estimated cost recalculation indices and catalogs of current prices for resources in the estimate and certificate of work performed;
- Flexible adjustment of calculation parameters, application of own accruals and limited costs;
- Calculations according to the methodology for determining the cost of construction products in the Russian Federation (MDS 81-35.2004) and the methodology of TSN in Moscow;
- Preparation of resource lists, sheets (form M-29), certificates (form KS-3), registers of documents and various certificates;
- Data exchange in ARPS 1.2 and 2.0, ESTML formats;
- Expert review of estimate documentation;
- A complete set of regulated output forms of documents with decoding of parameters, totals, calculations.
The software product is protected and contains code fragments that cannot be changed by the user, has software protection against unauthorized use. At the same time, the principle of maximum code openness is implemented to ensure the possibility of adapting the product to the needs of end users.
Product "1C:Enterprise 8. The estimate, revision 3 "is an original development, can be used as an independent configuration or as a module for the developed solution" 1C:ERP Construction Organization Management 2.0. "
2010: "1C: Estimate" with a collection of TSN-2001
TSN-2001 were put into effect on December 1, 2006 in accordance with the Decree of the Government of Moscow dated 14.11.06 No. 900-PP "On the procedure for switching to determining the estimated cost of construction of facilities in the city of Moscow using territorial estimate standards in the price level as of January 1, 2000." For organizations engaged in construction activities at the expense of the city budget in Moscow, the use of TSN-2001 is a prerequisite.
As of October 2010, the 1C: Smetma program, equipped with a TSN-2001 collector for Moscow, in conjunction with 1C: Construction Contractor 3.0. Construction Production Management "and" 1C: Construction Contractor 4.0. Financial management "can now be effectively used on Moscow projects financed from the city budget.
The program is equipped with a search function for all data arrays, which greatly facilitates work with documentation. It is regularly updated according to TSN-2001 indices and other estimated standards. You can find a complete list of estimate and regulatory bases with which the 1C: Smetma software product is equipped on the IMPULSE IVC website. The program "1C: Smeta" is developed on the modern platform "1C:Enterprise 8" and uses all its advantages and capabilities.