Customers: Digital regulators of NGO Mechanical engineering and instrument making Contractors: Complex Plus Product: Gate ACSНа базе: 1C: Enterprise 8.0 Project date: 2015/03 - 2015/08
|
September 16, 2015. A system ACS for NPO Regulyator Ltd on a basis is developed and implemented GATE IP. The system of pedestrian pass with a tourniquet like "tripod" and the system of journey with a barrier.
Access to Quality Department premises is installed separately. GATE IP controllers (3 pieces) and the readers U-Prox-Gate (U-Prox-mini) of 6 pieces are used. All schemes are executed with power supply reservation. Software – GATE Server-Terminal was set on the available customer's server, the time recording is configured. All employees were brought in base with photos. At intersection of the check point protection observes a photo and these persons of the crossing check point, representatives of the company integrator reported TAdviser.