"The Yaroslavl plant of drinks" completed implementation of an APCS for management of the boiler house
Customers: Yaroslavl plant of drinks Contractors: Krug, NPF, Heat engineering Product: PTK KRUG-2000Second product: DevLink-C1000 Industrial controllers Third product: SCADA KRUG-2000 Project date: 2015/10 - 2016/05
|
On August 29, 2016 the Krug company announced start of PTK KRUG-2000 as an APCS of the boiler house of "The Yaroslavl plant of drinks". A system implemented NPF Krug in partnership with Teplotekhnika LLC.
Project Results
The boiler house management system of "The Yaroslavl plant of drinks" is put into operation on the platform of KRUG-2000 software and hardware complex. The boiler house is equipped with two gas boilers, one boiler and the deaerator of atmospheric pressure.
A system is intended for remote control of process parameters and signaling of violations of work of the boiler house.
As a part of the bottom level of a system gas metering device, primary transformers and electric drives of shutoff valves.
The industrial DevLink-C1000 controller and modules of input-output DevLink-A10 provide collecting and preprocessing of input information signals for transfer on an automated workplace of the manager under management SCADA KRUG-2000, transfer of corrective action on actuators.