Hydroelectric power station Bochats (Republika Srpska)

Customers: Hydroelectric power station Bochats (Republika Srpska)

Power

Product: PTK Tornado-N (prototype of the National platform of industrial automation, NPPA)

Project date: 2014/03  - 2016/09

In 2014 (the beginning of design)-2016 years (delivery in commercial operation) the Tornado Modular Systems company executed the project on automation of two 55 MW hydraulic units everyone for hydroelectric power station Bochats (Republika Srpska). PTK "Tornado" was for the first time used for management of technology processes on hydroelectric power stations which unlike technical processes on TPP proceed more dynamically, start-up and stops of technology equipment are much more often performed. The algorithms of functional group management allowing the driver clicking of one button on the screen of the monitor were developed to perform start-up of a hydraulic unit with the set power, the possibility of parallel management of hydraulic units as from an automated workplace of the driver in a block board, and from the local panels set in cabinets of controllers in the machine hall is implemented. Active part in project implementation was taken by the Customer's specialists, checking all technical solutions and their program implementation.