Tornado Modular Systems - the Russian developer and the supplier of the automation equipment, management systems and software and hardware complexes (SHC)
Number of employees
2016 year
60
300px

Assets

+ Tornado Modular Systems

The Tornado Modular Systems company was created in 1992 in the Campus of the city of Novosibirsk by specialists of laboratory of "Trunk building block systems" of IAIE (Institute of automatic equipment and an electrometry) of the Siberian Branch of the Russian Academy of Science. Tornado Modular Systems - the Russian developer and the supplier of the automation equipment, management systems, software and hardware complexes (SHC). The modern, developing Russian company relying on high professionalism of employees, scientific potential and wealth of experience (more than 20 years in the Russian market). The link connecting advanced science and progressive industrial production.

The company is included into non-profit partnership of the hi-tech companies of the Campus "Sibakademsoft", is a resident of Academpark, acts as the industrial partner of IAIE and some other Siberian Branch of the Russian Academy of Science research establishments

Tornado Modular Systems are the Russian developer and the supplier of the automation equipment, management systems and software and hardware complexes. Systems are applied in power — combined heat and power plant, state district power plant, as in Russia, and abroad.

Complete solutions on the basis of PTK of own development and production

On the basis of PTK of own development and production the company proposes complete solutions on automation:

  • power units of TPP
  • small boiler houses
  • boiler units
  • objects of heating systems
  • turbine units
  • substations
  • STK of generators
  • dispatching centers
  • ECHSRIZ steam turbines
  • systems of antiabnormal automatic equipment
  • equipment and technology processes of industrial enterprises

Basic provisions of technical policy

  • Technology transfer of complex automation: make our product the most attractive to partner integrator, develop techniques of technology transfer of complex automation, provide the high level of training and support for partner integrators.
  • Complete solutions: The customer should receive finished system products, but not just a set of the automation equipment.
  • Failure from "private and corporate" solutions: the Customer has a need for development and modification of the implemented automation systems, the equipment and software therefore systems delivered by Tornado Modular Systems company are based on open international standards and are completely available to developers and users.
  • > Full range of services: the company having experience of maintaining large projects and smoothly running partner interaction acts as the general contractor and bears complete responsibility for successful project implementation at all stages, including maintenance.

The Tornado Modular Systems company implemented more than 150 management systems at the enterprises in 14 regions of the country and also the abroad. The largest objects are the PCS of the Krasnodar combined heat and power plant (410 MW), the PCS of power unit No. 1 of the Krasnoyarsk CHPP-3 (210 MW), the PCS of power units No. 4 and No. 5 of the Southern Sakhalin combined heat and power plant (115 MW and 93 MW), the PCS of RITES Uglevik (300 MW, the Republika Srpska).

Products of the company compete with the equipment offered in the market by the known companies, such as Siemens, Emerson, ABB and others. More than 50% of the components which are a part of systems implemented by the company are developed and is made by own forces or in cooperation with partners. Tornado Modular Systems Ltd are a resident of Technopark of the Novosibirsk Campus at which origins she stood along with Sibakademsoft association.

History

2017

The company acted as the cofounder of Association NPIA (national platform of industrial automation).

2016: Will receive Tornado Modular Systems from a sales tax of 18 million rubles

The "Development of the Perspective Automation Equipment for Control and Management Systems in Power and Other Industries" project from Tornado Modular Systems company is recognized in September, 2016 by the winner among projects with the maximum cost up to 36 million rubles.

You watch UER-smart Grid in more detail.

1992-2015

  • 2015-2016 The first series of the industrial computers IPC Gridex (the universal computing platform) is released. This opening of the new horizons.
  • 2014-2017 Ust-Hantaysky hydroelectric power station (The only hydroelectric power station in the world beyond Arctic Circle).
  • 2014-2015 Design and implementation of DCS of hydraulic units of the HEPS Bochats (Bosnia and Herzegovina).
  • 2014 The emergency recovery after the fire of a control panel boilers No. No. 8-12 on the Krasnoyarsk CHPP-1 with implementation of a management information system.
  • 2014 Beginning of works for TPP of Kazakhmysenerdzhi. The first project – turbine unit No. 4 of the Zhezkazgan combined heat and power plant.
  • 2013 The first big system of industrial automation – the PCS for the casting machines under pressure released JSC Siblitmash (Novosibirsk)
  • 2013 Commissioning of the PCS of the power unit of 300 MW of RITES Uglevik (Bosnia and Herzegovina).
  • 2012 Real start-up of PGU-410 of MW at the Krasnodar combined heat and power plant from the PCS based on a new series of PTK "Tornado-N".
  • 2011 Formal start-up of PGU-410 of MW at the Krasnodar combined heat and power plant from the PCS based on a new series of PTK "Tornado-N".
  • 2011-2013 RITES Uglevik (Bosnia and Herzegovina).
  • 2010 The company - the resident of Academpark (Novosibirsk).
  • 2010 Surge in development of systems for objects of electric power distribution (the systems of telemechanics).
  • 2009-2012 Krasnodar combined heat and power plant (Olympic venue).
  • 2009 The beginning of works on the MW PGU-410 PCS project at the Krasnodar combined heat and power plant, work with specialists of MHI company (Japan).
  • 2008 The beginning of design of PTK for the PCS of the power unit of 200 MW on the Krasnoyarsk CHPP-2 based on a new series of PTK "Tornado-N".
  • 2008 Development of PTK "Tornado-N" based on MIRage-N is complete.
  • 2008 Beginning of automation of CUC of Kazakhstan. The system of collecting and information transfer about the doavariyny mode (SSPI PA) covers all trunk PS of Kazakhstan with a class of voltage of 500 kV and above. 15 substations of classes 500 and 1150 of kV for KEGOK company.
  • 2007 One more shock year – 22 projects, among which upgrade of the systems of telemechanics and communication by order of 603 on objects of Novosibirskenergo, the Tomsk GRES-2, the Chita CHPP-2, TETs-2 in Astana, the New Kemerovo combined heat and power plant, the boiler house of Tomskneftekhim LLC, etc.
  • 2006-2008 Development of PTK "Tornado-N" based on MIRage-N
  • 2006-2007 Development of a series of the modules Mirage-N.
  • 2005 Development of PTK "Tornado-TM" for telemechanics objects is complete (the TORNADO-CCPPS, Tornado-KP-PA)
  • 2005 The first object of the ASOTI new direction for TGC-14 (Chita region).
  • 2004 The first boiler in Kazakhstan (CHPP-1 in Astana).
  • 2004 Launch of power unit No. 6 of the Novosibirsk CHPP-5 ("firstborn")
  • 2004 Entry into the market of ASDU in power industry.
  • 2004 The quality system is certified on compliance to the ISO 9000 standards.
  • 2003 First "surge" in number of contracts – in a year 14 (!) projects against 6 in the 2002nd and 6 in the 2003rd were executed: The Omsk CHPP-4, the Abakan combined heat and power plant, CHPP PPGHO in Krasnokamensk, the Tomsk GRES-2 and many others.
  • 2002-2006 Biysk combined heat and power plant (automation of the 3rd and 4th queue of the capital equipment).
  • 2002-2005 Development of PTK "Tornado-TM".
  • 2002-2005 Omsk CHPP-4.
  • 2002 The first boiler at the Biysk combined heat and power plant where the whole queue of boilers and turbines was automated afterwards.
  • 2001-2006 Chita. It is a lot of objects.
  • 2001-2004 Aykhalsky GOK, tube Anniversary.
  • 2001 The first PCS of the big boiler on the Chita CHPP-1.
  • 2001 The company started program implementation of import substitution and transition to own element base.
  • 2001 Accreditation of the metrological service.
  • 2000 Exit to international market. TPP Imin (China), TPP Kostolats-B (Serbia), TPP of Plevl (Montenegro).
  • 2000 Kuznetsk combined heat and power plant (fuel feeding PCS).
  • 1998-2006 Development of lines (series) of the modules MIF and MIC.
  • 1998-2003 Center of technical support "Motorola Semiconductors".
  • 1998 The first big cabinet of Rittal for EB-6 NTETs-5 is built.
  • 1997-2004 Creation of the first large full-scale PCS on the 6th power unit of the Novosibirsk CHPP-5. This work defined for many years as as the Company will do.
  • 1997-1998 Polygon of the PCS on the 1st power unit of the Novosibirsk CHPP-5.
  • 1997 The first PTK of the Company is delivered on the Novosibirsk fatty plant. The leader Dmitry Benediktovich, the general director of NZhK at that time, believed in prospects of new development and at own risk implemented it in the boiler house without certificate of conformity, and, thereby, broke off a vicious circle "There is no certificate – there is no implementation, there is no implementation – there will be no certificate …". By the way, the Company received the first certificate of conformity on PTK after this implementation.
  • 1996-1997 On oil wells of Western Siberia (the settlement of Gubkinsky, the Tarasovsky field) the oil production automated process control system based on progressive energy-saving technologies Gas-lift which cornerstone unique development of staff of the Company is was implemented ".
  • 1996 Entry into the market of the PCS in power.
  • 1996 Partner of UniControls company (Czech Republic), "Wonderware" (USA), etc.
  • 1994-1997 The first steps of the Company in a field of automation are connected with development of a number of the onboard measuring complexes (OMC) for JSC AvtoVAZ in 1994-1997 (Togliatti, the Samara Region). On the data which reached from "reliable sources", one of BIKOV, purchased by AvtoVAZ to year so in the 96th or 97th (hoz. the agreement "Blow"), in 2000 still safely transferred daily blows about a wall together with the Zhiguli cars which did not bear such blows any more.
  • 1994 Partner of PEP Modular Computers company (Germany).
  • 1992 The staff of laboratory of Trunk building block systems of Institute of automatic equipment and an electrometry of the Siberian Branch of the Russian Academy of Science founds Tornado of MS Company.