RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

SAM assessment on STZ is complete

Customers: Saransk Television Plant (STP)

Saransk; Electrical equipment and microelectronics

Contractors: Softline
Product: Software Asset Management (SAM)

Project date: 2016/03  - 2016/09
The project team from the customerIntegrator Consultant
не указана

At the Saransk television plant the SAM Baseline project according to the complex analysis of use of the software of Microsoft is implemented. As a result the customer obtained the complete information about software status and also the created purchase plan of the software of Microsoft for achievement of the maximum degree of license compliance taking into account specifics of IT infrastructure.

JSC Saransk Television Plant is industrial complex of federal level on creation of hardware containers and antenna sections of civil appointment.

The start of the SAM project at the plant was caused by the aspiration of the management to analyze a current status of IT infrastructure for its further optimization and also to reduce costs for its support. Besides, the purchase plan of the software of vendor for achievement of 100% of license compliance was required for the plant.

As the IT partner the Softline company which specialists have all necessary experience of projects implementation of Software Asset Management was selected. Being the certified SAM-Microsoft partner and also the owner of the status "Partner of Year" in this direction, Softline implements a full stroke of the works directed to improvement of quality of use of the software of vendor, increase in level of its license compliance.

During the project experts of Softline used the automated means of accounting and the analysis of software: the solution iTMan developed by Softline and also the product Assessment and Planning Tool (MAP) recommended by Microsoft company. License purity of desktop OS, office applications, development tools, the server systems, the Microsoft SQL databases was analyzed. The analysis of program assets allowed to set precisely the volume of the used software and also to prepare recommendations about process optimization of management of lifecycle of solutions of Microsoft.

Also within the carried-out works an assessment was given to a status of contracts for software of vendor, the actual number of relevant licenses is revealed, server, network equipment, the basic and applied systems and applications are inspected.

The carried-out interviewing by techniques of assessment of Asset Management Optimization Model became the basis for preparation of the report on assessment of level of a maturity of processes of SAM. Its materials contain the description of the main problem zones of IT infrastructure and recommendations about transition to the rationalized level of a maturity of SAM are made.

"the SAM audit booked by our specialists allowed the customer to define what quantity of program assets is used and is how effective. The received data can be used further at work on optimization of management of IT resources", – the representative of Softline of Krutsky Sergey, the IT consultant of department of business consulting, the certified technology expert of Microsoft of Softline company commented on project deliverables.

"Now we have absolutely clear understanding of a status of our IT infrastructure, we know how qualitatively to manage it and to minimize the cost of its support. It is sure, using the recommendations provided to us we will exclude possible legal risks and we will achieve the maximum license purity of the used software" — Larionova Yulia, the head of department of information technologies of JSC Saransk Television Plant noted.