Customers: SBK center Nizhny Novgorod; Information technologies Contractors: Sonet Product: Projects of DWHSecond product: DPC Projects of creation and upgrade Project date: 2016/03 - 2016/10
|
The Data Processing Center (DPC) is completely constructed on the equipment of Huawei.
The total area of the server premises – 40 sq.m.
Structure of the capital equipment:
- The RH1288 servers — 7 pieces;
- DWH of OceanStor 5500 V3 with two add-on modules;
- Core of network based on a stack 10G of switches;
- FC switching based on OceanStor SNS2124;
- 4 server cabinets with power distribution blocks;
- The UPS of 30 kVA with an additional battery cabinet;
- Monitoring system of the UPS and blocks of power distribution of DPC.
The constructed DPC with a monitoring system of batteries and the communication system between all offices meets requirements of the fast-growing company. Its capacities ensure continuous functioning of the enterprise and its branches, storage of the permanent growing amount of data. It is the only project of DPC in Nizhny Novgorod which is completely constructed on the equipment of Huawei.