Customers: Kursk Electric Apparatus Plant (KEAZ) Kursk; Mechanical engineering and instrument making Contractors: Yarus WMS (Navy Tier) Product: Yarus WMS systemProject date: 2013/07 - 2024/02
|
2024: Automation of the distribution center in the Moscow region
A project was carried out to automate a distribution center in the Moscow region with an area of 8,000 sq.m.
Automation Project:
- distribution center, area of about 8,000 square meters. m.;
- Address storage (static and dynamic)
- all operations are performed using RTSD;
- about 50 RTSDs are used simultaneously;
- Exchange data with a based enterprise system 1C Enterprise 8 using YARUS. API
- All warehouse activities from receipt to shipment are automated.
Features:
- batch accounting by year of issue, with the ability to build both FIFO and LIFO.
- Acceptance/assembly of items both piece and package.
- presence of a 4-storey mezzanine at the automation facility, division of tasks into assembly between the main warehouse (front pallet racks) and the mezzanine.
- transfer of tasks for TE transfer between the executors in the warehouse areas through the Routing unit.
- total control and grouping of the collected materials.
- delivery/acceptance of products from production.
- defragmentation of materials storage areas with division into warehouse zones (main warehouse and mezzanine).
2013: Production Warehouse Automation
Production warehouse, area about 5,000 m2;
- all operations are performed using RTSD
Features:
- The module Receiving goods from production (conveyor), seamless reception with a radio terminal (transfer from production) was successfully used.
- the facility has two remote sites, a mechanism for seamless movement of goods between warehouses using radio terminals is implemented
- most of the implementation was carried out by KEAZ employees independently using remote implementation technology, previously YARUS specialists provided:
- theoretical training with performance of practical tasks on the PC on the demonstration database - in the training class of the Contractor;
- workshop at the existing facility (exit to the warehouse complex under the control of YARUS WMS);
- certification based on the results of practical work;
- the system was partially adapted to the Customer's requirements during implementation;
- at the final stage of implementation provided consulting assistance when putting the system into operation.