Developers: | Rikor.IT |
Date of the premiere of the system: | 2021/03/05 |
Technology: | Storage System, Server Platforms |
Main articles:
2021: Storage Server Sales Star
On March 5, 2021, the company Rikor"" announced the expansion of its product portfolio and the start of production. storage servers The company begins mass production of server high-density platforms data storage based on the x86 architecture. Intel The platforms are based on a line of proprietary active beckplains on the company's specialized 36-port chips - Broadcom SAS35x36R with a 12Gbs transmission rate. data SAS
Thus, the company has prepared a hardware platform for partners who will be able to use it in integration projects with domestic software. For example, with Aerodisk software, decisions of Baum NPO, software products for building Reidix storage. All Ricor equipment has a conclusion from the Ministry of Industry and Trade confirming Russian origin.
As a Russian ODM manufacturer, we always focus on the needs of our partners, "emphasizes Boris Ivanov, vice president of Ricor. - As of March 2021, the company has accumulated extensive experience in operational development. We are now expanding our product portfolio with hardware-based server platforms for high-density storage. Platforms are available to ODM Production Partners. |
Storage platforms are based on the RIKOR server motherboard on the Intel Xeon Scalable 2nd, 3rd Gen processors and the RIKOR server chassis of the 2U, 3U, and 4U form factors.
The 2U disk platform subsystem supports up to 26pc 3.5 '/2.5 'hot-swap drives; Up to 20 3U 3.5 'drives, and the 4U platform holds up to 36 hot-swap 3.5' drives.
All platforms have optional support for 2 to 4 NVMe drives.
At the same time, all platforms are equipped with powerful fault-tolerant power supplies from 800 to 1200VT Platinum with hot-swap functionality and have the ability to install a protective panel on the front and rear sides of the server.
Platforms can be used in integration projects with domestic software. Partners of the company will be able to order equipment for testing in April 2021.