RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Efko GC (1C:ERP Enterprise Management 2.5)

Customers: Efko GC

Belgorod; Food industry

Contractors: KomLine (Kazan)
Product: 1C:ERP Enterprise Management 2

Project date: 2020/07  - 2021/01
Number of licenses: 55

2021: Implementation of "1C:ERP Enterprise Management 2.5"

  • Automated accounting of production, quality of raw materials and finished products.
  • Order production has been implemented with details up to stages and production operations. The fact of production is reflected on the next working day up to 12 hours.
  • Set up serial accounting for semi-finished products, finished products, provided raw materials.
  • Automated tax and accounting.
  • Automatic formation of regulated reporting according to the current legislation of the Russian Federation is set up.
  • Exchange with IS Opcenter (Preactor) was implemented to form an operational production plan (3-5 days) taking into account many planning factors (equipment loading, taste ranks, minimum number of washes, etc.).
  • Exchange with IE Proleit to obtain actual data with APCS (flow meters, separators and other equipment) on the production process.
  • Exchange with NPL (Laboratory) own information system was carried out to obtain data on orders for laboratory tests, laboratory tests of raw materials, auxiliary and basic materials and products.
  • Exchange with Procurement IS (SRM) was implemented to form orders to suppliers taking into account many factors (quotas for suppliers, logistics supply shoulders, prices, etc.), reflect the actual receipt of auxiliary and basic materials, form a plan of actual analysis for procurement