NBI-Engineering conducted surveys and thermal tests of the water supply system in T Plus

Customers: T Plus (formerly KES-Holding. Integrated Energy Systems)

Moscow; Power

Contractors: NBI-Engineering


Project date: 2022/07  - 2023/02

2023: Survey and heat tests of the service water supply system of Novogorkovskaya CHPP

Specialists of NBI-Engineering LLC carried out a project to conduct surveys and heat tests of the service water supply system of the Novogorkovskaya TPP of the Nizhny Novgorod branch of T Plus PJSC. NBI-Engineering announced this on March 15, 2023.

The purpose of the project was to determine the actual state of the service water supply system and issue recommendations to improve the efficiency of equipment operation.

During the project, NBI-Engineering specialists:

  • carried out inspection and operational tests of the service water supply system of the CHPP;
  • determined the technical condition and operating conditions of condensation units of steam turbines;
  • conducted tests of circulation pump units;
  • cooling towers were tested.

As a result of the project, the customer received a detailed report containing data on the actual condition of the equipment included in the service water supply system, as well as recommendations and solutions aimed at improving the reliable and economical operation of the service water supply system as a whole.