RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Two kilometers of fiber optic cables are enclosed in Promsvyazbank

Customers: Promsvyazbank (PSB)

Moscow; Financial Services, Investments and Auditing

Contractors: IT
Product: SCS projects and wireless network infrastructure

Project date: 2010/10

Content

The IT company executed the project and developed a complex of cable systems in the building of office center JSC Promsvyazbank.

Objectives

Planning opening of new office, the management of bank made the decision on creation of SCS for quick access to services and ensuring reliable operation of cable networks.

About the Project

At the beginning of 2009 specialists of IT were faced by a task to construct cable infrastructure with reservation of trunks and a possibility of a reconfiguration of network.

Implementation

Works are performed in several stages.

  • The project documentation is developed.
  • Supply of materials is performed.
  • Installation of a complex of cable systems is made.

Delivery of infrastructure in operation happened according to requirements. The project was executed "poetazhno", at first the first floor was "started". Then, works were conducted in parallel on different floors, and accommodation of employees of the bank, was performed on delivery of the floor at once.

Result

The project installed more than 2000 SCS ports in six floors of the building and about two kilometers of optical trunks are laid.