Customers: Kostroma TETs-1 Contractors: ES-Project Product: Comprehensive Engineering Systems ProjectsProject date: 2024/05 - 2024/06
|
2024: Turbine Generating Equipment Tests
Employees ES-Project conducted comprehensive tests of turbogenerating equipment. Kostroma TETs-1
What has been done within the project:
- Conducting comprehensive tests to determine the system-wide technical parameters of the generating equipment (installed capacity) of the Kostroma TETs-1;
- Preparation of a test report indicating the actual and normalized data on the installed capacity of each turbine unit and the plant as a whole.