RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Systam Electric has provided Gloria Jeans smart warehouses with uninterrupted power supply equipment

Customers: Gloria Jeans

Light industry

Product: Systeme Electric Uniprom ИБП

Project date: 2024/02  - 2024/08

2024: Use of Systeme Electric UPS

Systeme Electric uninterruptible power supplies provide reliable power supply to Gloria Jeans logistics centers. Systeme Electric announced this on September 4, 2024.

Stores of the vertically integrated retailer for September 2024 are presented in more than 300 cities. The presence of a developed network, as well as the sale of sales through marketplaces require fast and stable logistics. That is why the distribution centers of the company that ship orders operate on the basis of technologies using automated warehouse robots and sorting systems.

The safe and accurate operation of logistics centers in Novoshakhtinsk, Rostov Region and Moscow Region is provided by Uniprom 3L uninterruptible power supplies (UPS) from System Electric. In each of the centers, two groups of three-phase UPS with a total capacity of 1200 kVA were used to modernize uninterruptible power supply systems. Dekraft's low-voltage components, including choppers and shells, were also used to assemble the finished cabinets.

Such devices are easy to set up, operate and maintain, their fault-tolerant design simplifies installation and maintenance, compactness saves valuable space, and up to 96% efficiency ensures predictable energy costs.

In addition to the supply of equipment, System Electric under the contract SLA for 5 years performs service, providing round-the-clock support for installed UPS.

File:Aquote1.png
The September 2024 Systham Electric product offering includes several lines of three-phase UPSs, which are produced based on the best experience and our own developments. Therefore, they are the optimal replacement for equipment from foreign manufacturers that have left the Russian market. In addition, thanks to one engineering and service centers, we provide comprehensive support at all stages of the life cycle of projects, - said Roman Shmakov, First Deputy General Director of System Electric for the Information Technologies and Service markets.
File:Aquote2.png

Modern logistics complexes with a high level of automation significantly reduce the cost of processing Internet orders, as well as increase the speed and quality of operations in stores. That is why reliable power supply and level maintenance SLA becomes a particularly important factor for their operation.