Project

Mechel-Energo (Comprehensive Engineering Systems Projects)

Customers: Mechel Energo

Chelyabinsk; Power

Contractors: ES-Project
Product: Comprehensive Engineering Systems Projects

Project date: 2024/02  - 2024/05

2024: Testing of Steam Turbine No. 2

Employees ES-Project conducted thermal tests of the steam turbine No. 2 for the Moscow regional branch of LLC Mechel Energo"." Thermal tests of the turbine No. 5 of the thermal power plant were also carried out after overhaul, a steam jet ejector with the construction of the operating characteristic and its adjustment.

After overhaul, the TET turbines of the CHPP are carried out in order to:

  • Assessment of actual technical condition, rationing and optimization of operating modes;
  • Identification of causes and elimination of technical limitations of the turbine plant related to the state of vacuum and condensation systems;
  • Issue recommendations on improving the efficiency of their operation and achieving a nominal electric power of 6 MW in condensation mode.

The Customer received a technical report on the results of TA No. 2 tests with an assessment of the actual technical condition of the turbine plant and recommendations for improving the efficiency of its operation.