Content |
History
2025: Launch of the second stage of the plant in the Kaluga region for 12.5 billion rubles
Arkhbum Tissyu Group LLC (ATG, a subsidiary of Arkhangelsk Pulp and Paper Mill JSC) commissioned the second stage of the plant in the Kaluga Region with an area of more than 70 thousand square meters. m. This became known in June 2025 at the opening ceremony. The volume of investments in production amounted to ₽12,5 billion. Production capacity doubled - up to 140 thousand tons per year. An engineering infrastructure has been created - a power unit, treatment facilities, a water treatment system; a second paper machine and seven conversion lines are installed.[1]

