RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2

LUKOIL-Rostovenergo

Company

LUKOIL-Rostovenergo LLC is registered on March 3, 2009.

The beginning of operating activities – on July 1, 2009.

Four structural divisions (The Rostov CHPP-2, section of district boiler houses of Rostov-on-Don, the Volgodonsk CHPP-2, section of power grid economy of Kamensk-Shakhtinsky) which power facilities are located in the cities of Volgodonsk, Kamensk-Shakhtinsky, Rostov-on-Don are a part of LUKOIL-Rostovenergo LLC.

LUKOIL-Rostovenergo LLC is two thermal stations: The Rostov CHPP-2, the Volgodonsk CHPP-2, and six boiler, including five in Rostov-on-Don and one in Volgodonsk.

The total set electric power of power sources of LUKOIL-Rostovenergo LLC is 580 MW, the total set thermal power - 2739 Gcal.

The share of heatsources of LUKOIL-Rostovenergo LLC in the cities of presence makes: 63, 4% in Rostov-on-Don, 98% in Volgodonsk.

In 2011 supply of electricity by power plants of LUKOIL-Rostovenergo LLC was 1706, 5 million kWh, the heat power holiday from collectors made 4858 thousand Gcal.