Potential
"Potential" is a full-cycle plant where all stages of design and production of electrical installation products are presented.
History
2025: Allocation of 600 million rubles for digitalization
In May 2025, the head of Mari El paid a working visit to Kozmodemyansk. Yury Zaytsev visited one of the largest enterprises in Russia and the CIS for the production of sockets and switches - the Potential plant. At the same time, it became known that in 2025 the plant will send about ₽600 million to modernize equipment, digitalize and automate production. In 2024, the volume of investments reached ₽618 million. More than 30 projects have been implemented, thanks to which equipment is being modernized and production is expanding.[1]
2011
In May 2011, the Potential plant was part of Schneider Electric, a leading developer and supplier of integrated energy-efficient solutions, and was one of the five largest electrical engineering companies in Russia.
"Potential" is a full-cycle plant where all stages of product design and production are carried out: from the manufacture of parts and mechanisms to assembly and packaging. The activities of the plant "Potential" are focused on two key areas: modernization of the technical base and the release of new products.
In May 2011, the "Potential" plant was one of the largest Russian manufacturers of electrical installation products, offered a wide range of products for housing construction.
