RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2

Stroyproekt Institute, CJSC

Company

width=200px

Content

CJSC INSTITUTE STROYPROEKT. One of the design organizations of Russia in the field of road construction.

History

2011

Areas of activity

As of July 2011, Stroyproekt worked in the following areas:

  • integrated design of transport structures and roads;
  • Object Design Management
  • project management and construction control;
  • diagnostics of building structures;
  • justification of investments;
  • consulting and expert services.

Projects

According to the projects of the institute, bridges across the Neva were reconstructed - Blagoveshchensky, Troitsky, Alexander Nevsky, Liteiny, Palace, as well as a number of small bridges in the historical center of St. Petersburg, bridges of the restored palace and park ensemble of the Konstantinovsky Palace (State Palace of Congresses) in Strelna. The institute is the author of new bridges across Malaya Nevka - Lazarevsky and Bolshoi Petrovsky. Currently, projects are waiting for the construction of a bridge across the Bolshaya Neva in the alignment of 16-17 and 18-19 lines of Vasilyevsky Island (Novo-Admiralteysky) and a bridge over the Malaya Neva in the area of ​ ​ about. Serny.

Stroyproekt made a great contribution to the creation of the Ring Highway around St. Petersburg (since 2001 as the head institute for design). Specialists of the Institute designed artificial structures of the ring road with a total length of more than 20 km - bridges, overpasses, overpasses, transport interchanges. The largest object in the Ring Road was the first cable-stayed non-drivable bridge across the Neva - Bolshaya Obukhovsky in St. Petersburg. At this facility, the Stroyproekt Institute served as the general designer.

Stroyproekt participates in such significant projects as the development of transport infrastructure in Olimpiyskiy, the Sochi construction of a bridge across the Ob in (Novosibirsk with a record Russia 380 m long arch span), the construction of a new expressway - Moscow St. Petersburg, the reconstruction of federal roads M-8 Kholmogory and M-1 "" in the Belarus Moscow region, etc. As part of the construction direction of control, the Institute is currently working at the most complex facilities, including the Complex of Flood Protection Structures of St. Petersburg and the cable-stayed bridge across the Bosphorus-Vostochny Strait on Russky Island (which is being built in preparation for the APEC Summit 2012).

Logo in 2011

In total, over 20 years of work, the Institute's specialists have designed more than 500 bridges, overpasses, overpasses, transport interchanges, road sections in various regions of Russia.

The merits of Stroyproekt were awarded the diploma "The best supplier of St. Petersburg products under the state order," diplomas of the winner of the federal competition "Project of the Year" (in 2005-2008), diplomas of the Ministry of Transport and the Ministry of Regional Development of the Russian Federation, diplomas of the Legislative Assembly of St. Petersburg, Governor of St. Petersburg and other professional awards.

2010: Completion of design of West High-Speed Diameter in St. Petersburg

In 2010, the Institute completed the design of the Western High-Speed ​ ​ Diameter in St. Petersburg, one of the largest and most complex road projects in modern Russia.

1990: Foundation of the Institute

The Stroyproekt Institute (originally a small enterprise) was created in 1990 by a group of young Leningrad bridge engineers. Today his name is well known both in the northern capital and in Russia.