Tambovenergo

Company

Number of employees
2017 year
2000
300px

Owners

+ IDGC of Centre

Help

  • Since March 31, 2008 is a part of PJSC IDGC of Centre
  • The enterprise works at the territory of the Tambov region of 34.5 thousand sq.km with population of 1 million 100 thousand human.
  • Number of regions of the electric networks – 17
  • Number of staff – 2,000 people

Head: The acting deputy CEO — the director of the branch of PJSC IDGC of Centre — Tambovenergo Nikolay Valeriyevich Bogomolov

Production indicators

  • Total length of transmission lines on the route – 26,905.8 km
  • Quantity of PS-35-110 of kV – the 207th power - 2,502.0 MVA
  • The number of TP of 6-10/0.4 kV – 6038, power - 1,060.5 MVA
  • The volume of the electric power transferred in 2014 - 2, 895 billion kWh

With accounting of the equipment in leasing, lease and on agreements of service on 7/2/2015.


The PJSC IDGC of Centre branch - Tambovenergo is the largest resource supplying organization in the Tambov region, a leader of regional power. Specialists of Tambovenergo meet ten-year anniversary of the company with a special spirit, this important milestone in the history of the Tambov power supply system in many respects defined a vector of its dynamic development, expanded the horizons of perspectives and opportunities.

In the Tambov region the largest investment projects aimed at the development of housing construction, agro-industrial complex and the social sphere are implemented. And the Tambov power engineering specialists of IDGC of Centre enter the indisputable contribution to social and economic wellbeing of the region.

In a priority agrarian sector

Quickly growing economy of the Tambov region will claim the increasing volumes of new power capacities. First of all it is about the agrarian sector. Tambovenergo takes the most active part in implementation of the largest projects in the field of HSC.

Implementation in 2011 of the large-scale investment project on ensuring power supply of the enterprise, largest in the Tambov region, for production of fowl - Inzhavinsky poultry farm became an event, significant for branch. Thanks to the reached agreements between PJSC IDGC of Centre and the regional management, the rates in the region advancing the power grid infrastructure which provided reliable power supply of a poultry-farming complex was created. The speech first of all goes about construction of substation of 110/10 kV of "PTF" (a new power facility of this class of tension, the first for the last 15 years, to areas) both reconstruction of substations of 110/35/10 kV Inzhavinskaya and 35/10 kV Nikitinskaya.

In 2012 Tambovenergo performed technology accession to power supply networks of school of agrobusiness in the village of Tatanovo which construction was conducted within implementation of regional targeted investment program. During these works specialists of branch performed transfer of 700 meters of the line of 10 kV, built the power transmission line of 10 kV and two-transformer substation of 10/0.4 kV. Now the new school town with the developed infrastructure is powered from substation of 35/10 kV Gorelskaya and substations of 35/10 kV Tatanovskaya. Total power of the attached object is 416 kW.

Guarantee of reliability

In 2013 the PJSC IDGC of Centre branch - Tambovenergo completed technology accession to the electric networks of the Muchkapsky seed plant in the Tambov region. This the unique, not having analogs in Russia agro-industrial enterprise focused on a full stroke of production - from acceptance of grain before release at the exit of elite seed material, is equipped with the most advanced foreign equipment and is capable to process in day to 300 tons of seeds.

Within the agreement on technology accession of power performed reconstruction existing and construction of new two transmission lines of 10 kV from substation of 110/35/10 kV Muchkapskaya. Total power of the attached object to networks of Tambovenergo was 2.1 MW.

Technology accession of the building site of the Mordovian sugar plant, one of the largest investment projects in the region worth more than 9 billion rubles became a sign object of 2013. End of this stage of technology accession of a new object to networks of the company is key as ensuring high-quality and reliable power supply at a stage of construction will allow to perform in most short time mounting works and equipment checkout of production lines of the plant.

It is approved to terms of the contract on the next stages of power will perform installation of a cell KRUN-10 of kV with the vacuum circuit-breaker and microprocessor devices of relay protection and automatic equipment on substation of 110 kV Mordovian and also will execute installation of the vacuum circuit-breaker with microprocessor devices in a reserve cell of 10 kV of substation of 35 kV Chernyaevskaya. Total power of the attached object will be 2 MW.