RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2

Termoland

Company

Content

Owners

History

2024: Opening of a thermal complex in Penza for 700 million rubles

In Penza, the opening of a new family thermal complex "Termoland" took place. This became known in October 2024. The project, implemented by Osnova Group of Companies, became the first regional facility of the federal network outside the Moscow Region. Investments in equipment and launch of the complex amounted to about ₽700 million.

According to News.ru, the new city resort is located on an area of ​ ​ 10.7 thousand square meters. m, of which 7.2 thousand square meters. m occupies the covered part, and 3.5 thousand square meters. m is reserved for the street zone. The complex is capable of receiving up to 900 visitors at a time, offering them five pools, 15 different saunas and baths, as well as many functional areas.

GC Basis
Opening of a thermal complex in Penza for ₽700 million

President of Osnova Group of Companies Alexander Ruchyyov noted that the opening of the complex in Penza marks the beginning of the regional expansion of the Termoland network. The company manages seven city resorts with a total area of ​ ​ about 50 thousand square meters. m, including six facilities in the Moscow region. By the end of 2024, it is planned to open five more complexes with a total area of ​ ​ 48.6 thousand square meters. m

In the covered part of the Penza "Termoland" there are children's 20-meter and adult 32-meter pools with Jacuzzi, a font with mineral water, a SPA zone with healing mud, various baths, saunas and hammam. The third floor of the complex is reserved for a fitness center with cardio- and power simulators, as well as a hall for group classes.

The outdoor area of the complex includes a large terrace with sun loungers, a 22-meter pool with thermal water, an 11-meter pool with sea water and a children's inflatable pool measuring 15×12 meters.

The Termoland federal network for October 2024 covers 17 regions of Russia, including cities such as Moscow, St. Petersburg, Krasnodar, Yaroslavl, Krasnoyarsk, Kazan and others. The company is actively developing using modern financial instruments.[1]

2023: Investing 30 billion rubles in a network of thermal complexes

Osnova Group of Companies launches a network of Thermoland thermal complexes in the regions of Russia. About 30 billion rubles will be invested in this project, the president of the Alexander Ruchyyov development group said.

File:Aquote1.png
In the next few years, we plan to create about 50 such complexes, fill the vacuum after the departure of large foreign companies and become a new type of healthy leisure for the population, "he said in a conversation with TASS.
File:Aquote2.png

About 30 billion rubles will be invested in the project of a network of thermal complexes

Thermoland family thermal complexes are city resorts for year-round recreation of people of all ages. Each has aquazones with swimming pools and jacuzzi, wellness centers, bath complexes, children's areas, cafes and bars.

According to Sheets"," "Osnova" plans to open Thermoland thermal complexes in Orenburg,, Yaroslavl, and Yekaterinburg Murmansk other cities within five years. The article specifies that the first such object outside Moscow the region will appear in the Marmalade shopping and entertainment center in Orenburg. As Alexander Ruchyyov said, the area of ​ ​ the object will be 17 thousand square meters, investments in it - 1 billion rubles, it is planned to open the complex within a year and a half.

By April 2023, the company has 10 projects with a total area of ​ ​ more than 100 thousand square meters. m, including four in the capital region, with an area of ​ ​ about 50 thousand square meters. m Termoland works in the Rio shopping center on Bolshaya Cheremushkinskaya street, as well as on Witte Alley near the station m. "Admiral Ushakov Boulevard" in Moscow. According to the company's estimates, the volume of investments in the opening of one Termoland complex in Moscow and the regions, depending on the scale of each project, will amount to 500-600 million rubles.

Yegor Khramov, partner of Osnova Group of Companies, head of the Termoland development team, says that the company is also ready to take large sites of foreign companies that have ceased operations and left Russia for the implementation of infrastructure projects.[2]

Notes