The Raduga-2 company filled 100% of the areas of the first stage of own Data processing center in St. Petersburg. Primary clients of DPC are telecom operators, but technical capabilities will also allow to place and corporate clients. Among operators who are present at DPC it is possible to note Smart Telecom, Communication of Linxtelecom, Radion, GNII ITT Informica (Runnet) Federal State Institution, Orange, COMSTAR Regions, Lank Telecom, Severen Telecom, Prometey, Moscow time-ix, of "Yandex", "Mastertel the Northwest", Eurotel, "LEIVO", "RSITs"

Having successfully completed 100% of fillability of the first stage of DPC, the Raduga-2 company started design and building of the second queue of DPC to the address Kantemirovskaya St., 12. An expected payback period of the enclosed investments from 3 to 5 years.

The second queue of DPC will consist of two platforms on 20 and 30 cabinets respectively total power about at 250 kW. Both server will equip with the automatic fire extinguishing system, video surveillance, an access control system. Conditioning and humidity monitoring will be executed using precision conditioners with air supply through a raised floor with isolation of a cold corridor, a system power supply includes 3 independent inputs, including the diesel generator. All nodes are reserved according to N+1 system that corresponds to Tier3 level.

Power supply of DPC 365 days in a year are capable to work uninterruptedly for 24 hours a day. Confirmation to it lack of idle times during 2010 and support of power supply of servers of all clients within 14 hours during Blackout in August of the current year.

Technical parameters of telecommunication infrastructure of DPC open ample opportunities for implementation based on DPC of projects of any complexity:

  • In DPC cabinets of AESP Black Premium with perforated covers, address temperature sensors and a possibility of switching of loading between the brought phases are set;
  • In each cabinet own DDF for operational cross-switching with the general DDF of data center is prepared;
  • Power on a cabinet is 3 KW with increase on demand. Direct current feed 48B is brought at the request of the EPOS electroconverting installation.
  • In DPC are unrolled the system of cable passages, there are prepared routes from an input well directly to cabinets, mesh trays.