Customers: 25 Micron Izhevsk; Construction and Construction Materials Industry Contractors: BFG Group Product: BFG iMRPSecond product: BFG APS Third product: BFG iMES (formerly BFG QRM) Project date: 2022/12 - 2023/12
|
2023: Building a Simulation Production Model
25 Micron did not have a single IT platform that allows it to efficiently predict shipment dates and ensure transparency of production, and therefore there were frequent disruptions in order dates.
As part of the project, which ended in 2023, BFG Group carried out work:
- The stage of data collection, verification and validation was carried out;
- A simulation production model has been created;
- The procedure for NSI maintenance and storage has been developed (since the accounting system does not allow this);
- The production plan generation logic has been developed, which will ensure the required sequence of products on the anodizing line;
- Implemented BFG platform for end-to-end production management and dispatching.
Project results:
- Increased labor productivity by 15%;
- Reduced production cycles by 20%;
- Reduced WIP by 20%;
- Increased transparency and manageability of production.