Customers: FGC UES - Federal Grid Company of the Power pool system
Contractors: Smartengineering Product: Complex projects of creation of the engineering systemsProject date: 2013/03 - 2013/09
|
On August 13, 2013 the Smartengineering group announced completion of construction of the communication fiber lines (CFL) on one of objects of JSC FGC UES - substation (PS) Left-bank.
Project Tasks
Left-bank was required to carry out reconstruction of PS of 220 kV, having equipped it with communication fiber lines.
Work on the project
During the project the Smartengineering group performed works:
- construction of the linearly-cable constructions (LCC) of the fiber-optic communication line;
- installation and commissioning of the digital information transmission system (DITS) based on the equipment ABB (FOX-515) and Cisco;
- installation and commissioning of the equipment of High frequency channels of relay are sewn up;
- installation of equipment of HF of communication of production of SIEMENS (PowerLink), including works on HF to accession;
- installation and construction works on reconstruction of runs of 9 communication wires on PS of 220 kV Left-bank;
- construction of unsolderings and inputs of the linearly-cable constructions (LCC) of the fiber-optic communication line on adjacent substations.
Project Results
In a project deliverable JSC FGC UES had additional abilities to manage the PS complex of 220 kV Left-bank:
- reservation of communication channels in the direction from MES of Volga and the Samara PMES on PS of 220 kV of "KS-22', PS of 220 kV Left-bank, PS of 500 kV "Nitrogen' on the fiber-optic communication line;
- reservation of data transmission channels of telemechanics, APCS, RZ and PA, etc. in the direction from MES of Volga and the Samara PMES on PS of 220 kV of "KS-22", PS of 220 kV Left-bank, PS of 500 kV Nitrogen on the fiber-optic communication line;
- transmission channels of signals of RZA for reliable work of the RZA systems on 220 kV, adjacent to PS, Left-bank substations;
- reserve dispatching RF channels of communication and data transmission of telemechanics;
- 220 kV, reconstructed communication wires (mednozhilny) on PS, Left-bank (9 KLS), with run in the new all-substation operations control room (ASOCR).