RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

GC "1520" launched digital train management at Terekty station in Kazakhstan

Customers: Kazakhstan Temir Zholy NC KTZ (Kazakhstan temіr Zholy) Kazakhstan Railways

Product: Elteza MPC-EL
Second product: Elteza MPC-E

Project date: 2022/02  - 2022/09

Content

2022

Launch of digital train control at Terekty station in Kazakhstan

At the Terekty station Kazakhstan , the specialists of the LAT Division GC 1520 introduced a system of micro-centralization processor of arrows and signals (). MPC-E The international project was implemented jointly with on the "BT Signal" (Kazakhstan) railway network. The Group of National company Kazakhstan temir zholy JSC Companies 1520 announced this on October 5, 2022.

Now, with the help of a microprocessor traffic control system, the dispatching personnel remotely monitor the operating parameters of the floor equipment, control arrows and traffic lights. The equipment is designed for the special climatic conditions of the region and can operate in the range from -40 to + 70 C. The use of MPC-E will increase the safety and efficiency of transportation - the line capacity will increase.

Earlier, on the same site (Kyzylzhar-Zhezkazgan), GK 1520 digitalized the 60 km crossing.

The companies of the ZHAT Division have been participating in the development of the railways of Kazakhstan for more than 10 years, where they have already digitalized 80 railway stations.

MPC-E microprocessor centralization system equipment is manufactured by the capacities of the LAT GK 1520 Division.

Equipment with microprocessor centralization system

On September 1520 22, 2022, the Civil Code announced that. that digitalized the railway crossing in Kazakhstan.

Specialists of the ZHAT Division companies equipped the micro-centralization system processor with a junction on the main railway network of Kazakhstan. The international project was implemented jointly with LLP. "BT Signal" (Kazakhstan)

The MPC-EL system controls arrows and traffic lights, builds train routes, reduces intervals and increases traffic safety. Its implementation will increase the throughput of the line and the efficiency of transportation, ensure reliability and safety of work.

For more than 10 years, the companies of the ZHAT Division have been participating in the development of Kazakhstan's railways. In total, more than 80 railway stations have been equipped with digital systems in Kazakhstan as of September 2022.