Customers: Gazprom Dobycha Nadym (Nadymstroygazdobycha NSGD) Contractors: United Engine Corporation (UEC) Product: Comprehensive Engineering Systems ProjectsProject date: 2022/03 - 2022/09
|
Content |
2022
Supply of 18 industrial engines AL-31ST
engine-building Rostec oil-gas condensate The combined corporation announced on October 27, 2022, the supply of 18 industrial AL-31ST engines to the Bovanenkovskoye field, the largest in Yamal. The field is operated Gazprom by Nadym Production LLC, a 100% subsidiary of PJSC. Gazprom The power plants will ensure the operation gas-distributing of the units at three compressor stations.
The engines produced by Ufa the UEC-UMPO enterprise were supplied by UEC Engineering under the agreement 2021-2022. In October 2022, installation and commissioning works are underway.
Rostec continues to solve the strategic task of providing the Russian gas transport infrastructures domestic equipment. 80 such drives are already operating at Gazprom compressor stations, and by 2025 their number will grow to 125 units, said First Deputy General Director of Rostec State Corporation, Vladimir Artyakov.
|
The gas turbine engine of ground-based use is AL-31ST in the most popular power range of 16 MW, its distinctive features are high efficiency, efficiency and environmental friendliness.
Since 2020, the company has been constantly increasing the production of industrial engines. AL-31ST, which is constantly improving, is in demand on other Gazprom projects. In particular, the company will supply 12 power plants for the Power of Siberia until the end of 2023, noted the managing director of UEC-UMPO, Evgeny Semivelichenko.
|
Specialists of the UEC-UMPO and its branch of the OKB named after Lyulka significantly increased the resource of the power plant - from 75 to 125 thousand hours, while the warranty life increased from 6 to 8 thousand hours.
The Bovanenkovskoye oil and gas condensate field is the reference field of the Yamal gas production center and an important facility of the Unified Gas Supply System of Russia. Initial gas reserves - 4.9 trillion cubic meters. m, planned production level - 115 billion cubic meters. m per year.
Delivery of four sets of gas turbine units GTU-25P
United Engine Corporation Rostec shipped four sets of GTU-25P gas turbine units. They are intended for constructions the first stage of the booster compressor station at the northernmost gas condensate field of LLC Gazprom Dobycha Nadym"." The installations will operate in the immediate vicinity of the Kara Sea, in extreme conditions of the Far North and permafrost. Rostec announced this on October 6, 2022.
GTU-25P plants are the "heart" of gas pumping units, this is the most popular gas turbine equipment in projects for the development of gas fields and the transportation of blue fuel. GTU-25P can operate on natural and associated gas, so its operation in gas and oil fields is economically profitable. The maximum possible GTU-25P operating time declared by the manufacturer is 150,000 hours.
Gas production in the Arctic zone is a priority task in which we actively help fuel and energy companies. Today we delivered four units for the first stage of the booster compressor station at the Kharasavey gas condensate field. The production and delivery of two more sets of GTU-25P is provided for by the 2023 plan. In addition to gas pumping equipment, UEC also supplies power plants: as of October 2022, four Ural-2500 gas turbine power plants are operating here, which have accumulated more than 130 thousand hours in total. By the way, power plants based on these units provide not only production facilities, but also the village of Kharasaway, "said Vladimir Artyakov, First Deputy General Director of Rostec State Corporation. |
The Kharasavey gas condensate field is located on the western coast of the Yamal Peninsula, 520 km north of Salekhard. This area is characterized by a marine climate, low temperatures and strong winds. By the size of gas reserves (about 2 trillion cubic meters. m) the field belongs to the category of unique.
It is important that the reliability of our equipment is confirmed by work in any climatic conditions. In general, in the interests of Gazprom Dobycha Nadym, we plan to supply 24 gas turbine engines and gas turbine plants of various capacities in 2022. Gazprom has been and remains our main customer and strategic partner, "said Andrei Vorobyov, General Director of UEC Engineering LLC. |