RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Lamacon simulated the process of sorting goods in a Lamoda warehouse

Customers: Lamoda

Product: IT outsourcing projects

Project date: 2022/08  - 2023/02

2023: Building a Warehouse Optimization Model

On March 2, 2023, LAMACON (a subsidiary of Korus Consulting Group of Companies) announced that it had built an optimization model for the Lamoda warehouse, an online platform for selling goods from the field of fashion, beauty and life style. Experts conducted a scenario analysis and determined the collation parameters of the goods when using racks and without them.

Lamoda uses floor sorting of goods in its warehouses. The retailer decided to test how much it is possible to reduce costs if you organize the process of sorting orders in a new way, and calculate the necessary parameters using optimization modeling.

Lamoda specialists have collected a large amount of information: data on operating costs, labor costs, throughput capacity of each zone in the warehouse, product dimensions, packaging requirements, personnel productivity, etc. LAMACON experts used this data to build two mathematical models using a specialized industrial solution. The first model is for floor sorting, which completely repeats the current process parameters in Lamoda, the second - for gravitational.

As a result, LAMACON experts calculated scenarios for various sorting organizations and prepared recommendations on the optimal topology of the location of gravity racks.

File:Aquote1.png
The results of the scenario analysis became valuable information for us. We got accurate calculations and saw a significant difference between floor and gravitational sorting - in money, labor and occupied space. Together with LAMACON experts, they were able to predict potential savings even before capital investment in the project, "said Anastacia Alexandrova, head of the Lamoda supply chain efficiency group.
File:Aquote2.png

File:Aquote1.png
A joint project with Lamoda is a new experience for our team. We built simulation models to optimize warehouse processes. In two weeks, our experts prepared all the necessary calculations and found opportunities to improve the business efficiency of our partners, "said Dmitry Krasilov, General Director of LAMACON.
File:Aquote2.png