RSS
Логотип
Баннер в шапке 1
Баннер в шапке 2
Project

Translated to Ant Technologies the warehouse Metro Group Logistics in Noginsk under management of WMS Logistics Vision Suite

Customers: MGL Metro Group Logistics (MGL METRO GROUP Logistics)

Düsseldorf; Logistics and distribution

Contractors: Ant Technologies
Product: WMS Logistics Vision Suite

Project date: 2013/05  - 2020/12

2021: Transfer of a warehouse in Noginsk on WMS Logistics Vision Suite

The platform of import goods of the warehouse Metro Group Logistics complex in Noginsk earned under control of the WMS system of Logistics Vision Suite. On January 21, 2021 the Ant Technologies company reported about it. The project was implemented within the signed agreement according to the results of which all platforms of the distribution center Metro Group Logistics are consistently transferred to work with WMS LVS.

The Ant Technologies company continues to fulfill the obligations to Metro Group Logistics on automation of warehouse platforms in Noginsk. The implementation team was faced by a problem of replication of Logistics Vision Suite on other platform taking into account specifics of its processes and like the processed products. The automated platform works on the system of the centralized drain which processes import goods, so-called "dry" food, category non-food products. In a warehouse the system of address storage is organized, zones for rack and floor storage are selected. The warehouse is equipped with stuffed racks, equipment of warehouse space by shuttles is planned.

Features of setup of a warehouse management system consist in adaptation of the program for accounting of products by different criteria where number SCD, the country of origin, date of production, the termination of an expiration date, storage temperature, work with oversized goods enters. For data transmission in the automatic mode in a FSIS "Mercury" within the project integration of Logistics Vision Suite with the state system was executed. Interaction of systems is performed through an integration layer. Setup of data exchange Logistics Vision Suite with the Fair Sign system is planned. For this platform tuning of simultaneous processing of one set according to different specifications, on condition of presence on stock balance was performed.

Selection process of goods is conducted using the voice Vocollect Voice system which increases speed by 20% and minimizes errors in selection that in general increases quality of a complete set of goods to 99.95%

Implementation of technologies in each warehouse allows Metro Group Logistics to create the effective system of supply and to render the high level of service to the centers of small wholesale trade in METRO food.

2020: Integration of WMS Logistics Vision Suite with the system of marking of footwear

On November 26, 2020 announced Ant Technologies integration of WMS Logistics Vision Suite with the system of marking of footwear on the distribution center of Metro Group Logistics.

The implemented solution allows to control onto the arriving and shipped marked products and to transfer data to the Fair Sign system.

Since July first, 2020 the resolution on prohibition of turnover of unmarked shoe goods took effect. Thus, all movements of shoe products should be registered in the Fair Sign system. According to dannyit requirements players of the market are obliged to upgrade internal infrastructure for a possibility of fulfillment of requirements on transfer of data in the system of marking.

The Ant Technologies company was attracted to introduction into working at the warehouse Metro Group Logistics WMS system platform of necessary completions. The software module allowing WMS via the integration gateway was as a result written and implemented to interact with the system of digital marking and traceability of goods.

The majority of the goods provided to METRO come to shopping center through the distribution center in Noginsk, this huge number a pallet. That the goods long were not delayed at acceptance by specialists of Ant Technologies the possibility of partial checking of correctness of codes of marking was configured. On an input the operator scans the aggregated codes of marking of transport packagings or boxes, partial control of codes of marking when opening a factory box is executed. Selection and shipment can be made by the whole boxes without scanning of codes of marking and by the piece, with scanning of each code.

File:Aquote1.png
Thanks to high flexibility of the WMS system of Logistics Vision Suite we can implement all tasks, necessary for us, that allows us to receive high efficiency and adaptivity in work. Integration of interaction of a warehouse management system with the system of marking on the platform working on cross docking is the first stage in optimization of work of a warehouse complex. Further, this solution will be postponed for other warehouses of the distribution center in Noginsk, - commented in Metro Group Logistics.
File:Aquote2.png

  • 1 XLIFFService: Error in XliffFile2XliffString method.

2016

For the purpose of optimization of a supply system and growth of sales volumes different schemes of deliveries are applied to different types of products to distribution centers of METRO. At this stage process of implementation of Logistics Vision Suite on the platforms working on BBxD technology, providing distribution planning of the expected entering flow and management of placement of a trade inventory in case of deficit, sorting of the accepted trade inventory along shipment routes is complete at once, passing storage function.

At this stage of warehousing the supplier receives one consolidated order from all Shopping Center METRO and independently delivers the order to the distribution center where there is a distribution of the received goods according to the order of each shopping center and the subsequent sending. This section is characterized by high intensity of logistic processes, so, the average quantity of the processed boxes in day can be more than 150,000 pieces. Selection process is organized according to the pick-by-line system (distribution of the accepted goods without setting on storage) that allows to maintain high turnover of trade inventories. Selection of goods is implemented with a possibility of execution of operations using paper or the shipping documentation technologies. In the course of implementation of Logistics Vision Suite on objects of METRO setup of the interface of exchange between WMS LVS and ERP was made, batch print of documentation is implemented.

Application of the scheme BBxD showed advantage and benefit, showing high rates of growth of sales volumes, increases in frequency of deliveries, customer service improvements. The highly effective WMS system of Logistics Vision Suite configured for process management, conforming to requirements to storage and processings of goods in METRO Group, is aimed at decrease in logistic costs in a supply chain and optimization of a supply system in shops and shopping centers, supports the strategy of development for the international retailer.->

2015: Implementation of Logistics Vision Suite on the platforms working on BBxD technology

April 15, 2015. "MGL Metro Group" reported Logistics[1] about updating of a warehouse control system of WMS.

The company tries to obtain an assigned task by the organization of an effective supply chain. For the purpose of optimization of a supply system and growth of sales volumes different schemes of deliveries are applied to different types of products to distribution centers of METRO. At this stage process of implementation of Logistics Vision Suite on the platforms working on BBxD technology, providing distribution planning of the expected entering flow and management of placement of a trade inventory in case of deficit, sorting of the accepted trade inventory along shipment routes is complete at once, passing storage function. At this stage of warehousing the supplier receives one consolidated order from all Shopping Center METRO and independently delivers the order to the distribution center where there is a distribution of the received goods according to the order of each shopping center and the subsequent sending.

This section is characterized by high intensity of logistic processes, so, the average quantity of the processed boxes in day can be more than 150,000 pieces. Selection process is organized according to the pick-by-line system (distribution of the accepted goods without setting on storage) that allows to maintain high turnover of trade inventories. Selection of goods is implemented with a possibility of execution of operations using paper or the shipping documentation technologies.

In the course of implementation of Logistics Vision Suite on objects of METRO setup of the interface of exchange between WMS LVS and ERP was made, batch print of documentation is implemented.

Application of the scheme BBxD showed advantage and benefit, showing high rates of growth of sales volumes, increases in frequency of deliveries, customer service improvements. The highly effective WMS system of Logistics Vision Suite configured for process management, conforming to requirements to storage and processings of goods in METRO Group, is aimed at decrease in logistic costs in a supply chain and optimization of a supply system in shops and shopping centers, supports the strategy of development for the international retailer. Within the project works on development and deployment of the module of management of the yard (YARD) and implementation of voice technology for a number of platforms are continued.

2013: The agreement on implementation of WMS Logistics Vision Suite in a warehouse complex

The Ant Technologies integrator and "MGL METRO GRUP LOGISTICS" company signed the agreement on system implementation of management of the warehouse WMS Logistics Vision Suite in a warehouse complex of "MGL METRO GRUP LOGISTICS" company in Noginsk, the press service of integrator reported on May 21, 2013.

The project provides consecutive start of the WMS system of Logistics Vision Suite on all 6 platforms where MGL company operates. The first platform for implementation of the automation equipment selects the warehouse working on BBxD technology. Such technology provides distribution planning of the expected entering flow and distribution control of a trade inventory in case of deficit and sorting of the accepted trade inventory along shipment routes, excepting storage function at once.

In addition at the first stage of the project it is supposed to implement a management system for the yard of Logistics Vision Yard with a possibility of planning by suppliers of a window of delivery and the integrated call-back. Then consistently it is necessary to bring into operation the sections of the MGL warehouse complex connected with processing of the frozen products, fish products, fresh vegetables and fruit and so on. The general project duration is expected one and a half years. As a part of the project delivery more than 400 user licenses WMS Logistics Vision Suite.

Notes