Customers: Plant of Plastic Contractors: Neolant Product: AutoCADProject date: 2015/02 - 2015/11
|
Content |
On July 7, 2016 the Neolant company announced completion of preparation of the project documentation by request of JSC Plant of Plastic. A project objective - reconstruction of production capacities[1].
Project Tasks
The plant works in the city of Kopeysk of Chelyabinsk region on two production sites of 456 hectares. Primary activity of the plant - production, repair and utilization of ammunition. The plant is engaged in production of industrial explosives and release of the nanoblend containing ultradispersed diamonds.
Project Results
Neolant performed a complex of project works within which developed project * documentation for rebuilding plans of the plant:
- reconstruction of the existing engineering on-site networks;
- heat supply and water supply (including system design of cleaning and disinfecting of artesian water, laying of a new heating main of superheated water);
- design of the gas pipeline for gas supply of the modular boiler house;
- reconstruction of the existing on-site pipelines of compressed air;
- reconstruction of the on-site and feeding cable lines existing, replacement physically worn-out electric networks – 6, 7 km.
- reconstruction of outside lighting of the main production site;
- reconstruction of treatment facilities;
- reconstruction of highways and railway tracks;
- reconstruction of buildings of workshop No. 11 (buildings 235, 235/5): replacement of internal utilities, finishing of walls, floors and repair of a roof of buildings.
The works in the project are completed in 2015.